Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM07703
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/27/2018 | MCASTRO2 | ZONING | REVIEW | Approved | |
09/27/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide an analysis of the required ventilation for the entire area served by the existing rooftop unit noted on sheet M2.01 (e.g. offices, telephone/data entry, and main entry lobby). 2. The current ventilation calculation table onsheet M2.01 calls out 130 CFm of exhaust. This is not shown on the drawing; are you confusing exhaust with return? |
09/27/2018 | MCASTRO2 | ENGINEERING | REVIEW | Passed | |
09/27/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
09/28/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Assign a branch circuit number for the devices and luminaires in each room or area that correlates with the panel schedule. NEC 408.4. "EX LOAD" does not satisfy the requirements of art. 408.4 NEC. Ref; 2012 IBC 107.2.1, 2011 NEC |
09/28/2018 | JVINCEN1 | FIRE | REVIEW | Approved | |
09/28/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet G101; Level 2 Plan: Please provide the exit access travel distance from the Level 2 to the exit on Level 1. 2. Sheet A101; Level 1 Demolition Plan: Please add Keynote D1 to the floor plan. 3. Sheet A101; Level 1 Floor Plan: Please add Keynote 1 to the floor plan. 4. Sheet A601: The City of Tucson requires all lettering (upper and lower case) to be a minimum of 3/32" in height. Please revise the Hardware Groups. 5. General: Please provide written responses to all review comments. |
09/28/2018 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
10/26/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/10/2018 | QJONES1 | APPROVAL SHELF | Completed |
10/10/2018 | QJONES1 | OUT TO CUSTOMER | Completed |
10/10/2018 | QJONES1 | REJECT SHELF | Completed |