Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T18CM07703
Parcel: 110113620

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T18CM07703
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/27/2018 MCASTRO2 ZONING REVIEW Approved
09/27/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide an analysis of the required ventilation for the entire area served by the existing rooftop unit noted on sheet M2.01 (e.g. offices, telephone/data entry, and main entry lobby).
2. The current ventilation calculation table onsheet M2.01 calls out 130 CFm of exhaust. This is not shown on the drawing; are you confusing exhaust with return?
09/27/2018 MCASTRO2 ENGINEERING REVIEW Passed
09/27/2018 ROBERT SHERRY WATER REVIEW Completed
09/28/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
#1. Assign a branch circuit number for the devices and luminaires in each room or area that correlates with the panel schedule. NEC 408.4. "EX LOAD" does not satisfy the requirements of art. 408.4 NEC.
Ref; 2012 IBC 107.2.1, 2011 NEC
09/28/2018 JVINCEN1 FIRE REVIEW Approved
09/28/2018 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet G101; Level 2 Plan: Please provide the exit access travel distance from the Level 2 to the exit on Level 1.
2. Sheet A101; Level 1 Demolition Plan: Please add Keynote D1 to the floor plan.
3. Sheet A101; Level 1 Floor Plan: Please add Keynote 1 to the floor plan.
4. Sheet A601: The City of Tucson requires all lettering (upper and lower case) to be a minimum of 3/32" in height. Please revise the Hardware Groups.
5. General: Please provide written responses to all review comments.
09/28/2018 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
10/26/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
10/10/2018 QJONES1 APPROVAL SHELF Completed
10/10/2018 QJONES1 OUT TO CUSTOMER Completed
10/10/2018 QJONES1 REJECT SHELF Completed