Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: CELL TOWER/ANTENNAS
Permit Number - T18CM06874
Review Name: CELL TOWER/ANTENNAS
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/09/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Submit a geotechnical soils report as referenced in the structural calculations for the Foundation/Concrete for the monopole on page 3 of 60. 1603.1.6 IBC (This comment was listed on the plan review condructed on 9-14-2018) Second review. 2. The CMU MASONRY WALL DETAIL on sheet S-1 does not match the reinforcement specified on the structural calculation; please clarify. IBC 107.2.1. 3. Please remove reference to CITY OF MARICOPA form sheet S-1. IBC 107.2.1 4. Please provide the names of the individual Special Inspectors for the Special Inspections designated on the SPECIAL INSPECTOR CERTIFICATE. IBC 1704.2 |
10/09/2018 | GPERU1 | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet E-4; Cite the proper electric utility provider and AIC rating shown on the ONE-LINE DIAGRAM which is TEP, not SRP, as shown on the service reference. (This comment is carryied over from the plan review conducted on 9-14-18 which was not corrected.) Second review. |
10/17/2018 | PETER MCLAUGHLIN | PLANNING-CITY HALL | REVIEW | Approved | |
10/18/2018 | DAVID RIVERA | ZONING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/13/2018 | QJONES1 | APPROVAL SHELF | Completed |
11/13/2018 | QJONES1 | OUT TO CUSTOMER | Completed |
11/13/2018 | QJONES1 | REJECT SHELF | Completed |