Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM06808
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/31/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 09/07/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet S1.1; Framing and Foundation Plans: Please provide structural calculations for the framing and foundation design. 2. Sheet S1.1; Foundation Plan: Detail 5/S2.1 is referenced in two locations on the plan. These detail references should be removed from the foundation plan (the detail cuts are on the Framing Plan). 3. Sheet S1.1; Foundation Plan: Note 2 was not located on the plan. Please verify. 4. Sheet S2.1; Detail 4: Should the Detail 5 indicated on the Foundation Plan (Sheet S1.1) be revised to this detail? Please verify. 5. General: Please provide written responses to all review comments. |
| 09/10/2018 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 09/18/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 09/18/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Verify the pipe labels for chillers CH-1 and CH-2 as shown on diagram A/M2.0 - there has to be some CHWS piping. 2. Clarify the extent of the security fencing for the chillers. Reference: Section 107.2.1, IBC 2012. 3. Provide a COMcheck Compliance Certificate for the chillers and cooling towers. Reference: Section C403.2.2, IECC 2012. 4. Identify the locations for the termination of the refrigerant relief valves for the chillers. Reference: Section 1105.7, IMC 2012. |
| 09/21/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 09/25/2018 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T18CM06808 - Replace HVAC Cooler Tower and add Canopy Related DP18-0066 Building Plan Review (1st Review) Fellow Ship Square 8111 E. Broadway Boulevard - O-3 Zone TRANSMITTAL DATE: September 27, 2018 DUE DATE: September 25, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the plans for compliance with the current approved version of the development package. While the proposed location does not appear to encroach or cause a loss of parking spaces with the new canopy it is not clear on the building plans how the parking area is affected. A revision to the DP will have to be processed for review and approval. Once the DP has been reviewed and approved include a copy of the approved revised DP with the next submittal of these building plans. 2. Zoning will review the plans and verify that they are in compliance with the approved revision of the DP. In addition zoning cannot approve the building plans until the building plans have been approved by the PDSD Commercial Plans reviewers. |