Permit Number: T18CM06771
Parcel: 11942006J

Review Status: Active

Review Details: COMMERCIAL - NEW

Permit Number - T18CM06771
Review Name: COMMERCIAL - NEW
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
09/12/2018 MARTIN BROWN FIRE REVIEW Reqs Change Please verify occupancy classification with building department. This looks like an "F" occupancy.
Please provide some commentary on who is responsible for housekeeping and sawdust removal.
Will there be paints, stains, solvents at this facility? If so, please provide quantities and method of starage.
Will the individual dust collectors be tied into the duct system? Please provide cut sheets on collectors.
Please indicate on plans number and locations of fire extinguishers.
09/19/2018 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet g1.0; Deferred Submittal: Please add to the Deferred Submittal note to follow the IBC Section 107.3.4.1 for the deferred submittal requirements.
2. Sheet g1.2; Code Analysis: The Occupancy Classification is listed as B. Per the IBC Section 306.2, it would appear this classification should be F-1 (moderate hazard factory). Please verify and revise as required.
3. Sheet g1.2; Code Analysis: The allowable area for an F-1 classification is 8500 SF. Please revise the drawing.
4. Sheet g1.2; Code Analysis: Please revise the fire rating statement to indicate Group F-1. Table 602 requires no fire resistance rating for the exterior walls.
5. Sheet g1.2; Code Analysis: Please revise the plumbing fixture requirements for men's and women's water closets to 17/100 = 1, for men's and women's lavatories to 17/100 = 1, drinking fountains to 33/400 = 1 (high/low or single point of use), and 1 service sink.
6. Sheet g1.2; Floor Plan: Per the IBC Section 1016.3, exit access travel distance shall follow the unobstructed path of horizontal and vertical egress travel to the exit. Please revise the diagonal paths indicated in the finishing and fabrication rooms.
7. Sheet s1.0; Structural Notes (Foundations): Note 1 indicates a soil report was used for the foundation design. Please provide one copy of that report for review.
8. Sheet s1.0; Structural Notes (Post Installed Anchors): Please revise the IBC Edition in Note 10 to the 2012.
9. Sheet s2.0 (Foundation Plan); Structural Calculations (SWB): The structural calculations indicate hold downs are required at SWB (east end), but none are indicated on the plan. Please verify.
10. Sheet s2.0 (Foundation Plan); Structural Calculations (Footing Design): The calculations indicate a 1'-6" wide footing, while the drawing indicates a 1'-4" wide footing (F1). Please coordinate.
11. Sheet s3.0 (Roof Framing Plan); Sheet a3.0 (Roof Plan): Please indicate the roof hatch on Sheet s3.0 per the architectural roof plan.
12. Sheet a2.0; Reflected Ceiling Plan: Please reference Sheet e3 for exit signage.
13. Sheets a6.0 and a7.0; General Notes: Note 1 references Sheet g1.2 for typical mounting heights. Please revise that reference.
14. Sheet a7.0; Room Schedule Comments: Please finish Note 3.
15. General: Please provide the Special Inspection Certificate with Parts A and B filled out.
16. General: Per the IBC Section 307, please provide a list on the drawings of the hazardous materials that will be present in this building, and include the quantities of each. Referencing the IBC Tables 307.1(1) and 307.1(2), verify the acutal quantities do not exceed the Table values. In addition, verify the pertinent issues of the hazardous materials in this project meet the requirements of the IBC Section 414.
17. General: Please provide written responses to all review comments.

Reviewed by Eric Newcomb
Contact at 520-837-4911
09/19/2018 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Approved
09/25/2018 ROBERT SHERRY WATER REVIEW Reqs Change The water meter and backflow preventer referenced on the water calculations are not existing. Show their locations on a site plan. Reference: Section 107.2.1, IBC 2012.
09/26/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Provide structural calculations for the mounting shelf for the water heater to show that the water heater will be safely supported from the building structure (studs are 24" OC). Reference: Section 301.2, IPC 2012.
09/27/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. The finishing room does not have the same ventilation characteristics as the fabrication room due to the finishing products in use. Consider the use of an art classroom as resembling the ventilation requirements of the fabrication room (alternatively provide an engineering analysis of the area; e.g. dilution ventilation for vapors). Provide exhaust for the finishing room. Reference: Section 403.3, IMC 2012; see also the 2012 IFC for application of combustible or flammable finishes.
2. Show the location and footprint of each dust collection device that will be installed for each dust-generating piece of equipment. Reference: Sections 510.2.1 and 511.1, IMC 2012.
10/01/2018 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
PDSD Zoning Review Section

PROJECT: T18CM06771 - New Building (Wood Shop for RV Park)
Building Plan Review (1st Review) Rincon Country West RV Resort
4555 S Mission Road - RV Zoning

TRANSMITTAL DATE: October 1, 2018

DUE DATE: October 4, 2018

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


1. COMMENT: Zoning has reviewed the building plans for compliance with the submitted development package. While the building footprint is consistent with the DP as it relates to the zoning review purview (Building footprint, Height, square footage, site conditions etc) zoning cannot approve the building plans until the PDSD Commercial Plans reviewers have approved the building plans.

2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. (Include a copy as reference of the approved and PDSD stamped version of the DP with the next building plan submittal.)

3. COMMENT: If any changes are necessary, due to the PDSD Commercial Plan Reviewer's comments that affect or change the building footprint, height, or square footage, the DP will need to be updated prior to approval of the building plans by Zoning.

For Height reference, label the proposed roof height (tallest side) on the Cross Section Drawing sheet a5.0.

4. COMMENT: Once the plans have been reviewed and approved by the 3rd Party and PDSD Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning.


If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: As noted by the zoning comments
10/02/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
#1. Please classify the areas about the wood working equipment as applicable to NEC art's 500 thru 506.
Ref 2012 IBC aec 107.2.1, 2011 NEC articles for hazardous areas 500-506.
10/03/2018 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change T18CM06771

1) Engineering can conduct an over the counter review of the building plans once the development plan has been approved and any outstanding review comments have been addressed
2) Show on plans that any roof drains (downspouts) scupper underneath sidewalks or pedestrian walkways. Reference City of Tucson Technical Standard (TSM) 7-01.4.1.E. coordinate placement with the development plan

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007

Final Status

Task End Date Reviewer's Name Type of Review Description
09/06/2018 ANY REJECT SHELF RECEIVED