Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM06730
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/27/2018 | NROSS1 | ZONING | REVIEW | Approved | |
08/27/2018 | GPERU1 | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. If mechanical system is being altered or replaced, a mechanical plan will be required. Please verify. |
08/27/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide complete compliance for the 2012 IECC for the lighting. Also the seal is expired. |
08/27/2018 | NROSS1 | ENGINEERING | REVIEW | Passed | |
08/27/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet D1.0; Demolition Floor Plan: A key at the southwest corner of the building has no photo number. Please provide. 2. Sheet D1.2; New Lintel: The calculation on this sheet indicates to extend the new channels 2' past the opening. Section 1 on this sheet indicates the channels to extend 16" past the opening (2" + 4" + 4" + 4" + 2"). Please coordinate. 3. Sheet A1.1; Code Information: The minimum number of exits is determined by the IBC Section 1015.1. For occupant loads greater than 49 and less than 500, two exits are required. Please revise the notes on A1.1 (2 exits required, 4 exits provided). 4. Sheet A1.1; Code Information: The maximum exit travel distance reference should be Table 1016.2. Please revise the note. 5. Sheet A1.1; Code Information: Since this is a mixed occupancy (M/S-1), provide restroom calculations per the IBC Section 2902.1.1. 6. Sheet A1.2; Details 3 through 9: Please indicate the size of the metal stud kickers, and indicate the size and quantity of connectors to the top of the partition. Extend the detail to show how the kickers connect at the structure above. 7. General: Please provide written responses to all review comments. |
08/27/2018 | GPERU1 | WATER | REVIEW | Reqs Change | 1. Provide a plumbing site plan. Indicate the location, type and size of the water meter and backflow prevention valve. |
08/27/2018 | GPERU1 | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a DWV plumbing isometric plan; show sizes of drain and vent piping. P1.0 2. Provide a plumbing fixture schedule for verification of water pipe sizing and water service. P1.1 3. Indicate the sizes of all existing drain pipe that recieves discharge of new plumbing fixtures. P1.0 4. The ice machine will require a backflow prevention valve; specify type and model of BF prevention valve. P1.0 5. Indicate the sizes of all watermains for connection to new plumbing fixtures. P1.1 6. Provide a site plan that shows the location of the water service pipe, backflow prevention valve and size/type and model of the water meter. P1.1 7. Identify all valves on the water distribution piping. P1.1 8. Indicate the location and sizes of new cleanouts. P1.0 9. Specify the sizes of all new drain piping; indicate vent pipe sizes. P1.0 |
08/27/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
08/27/2018 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |