Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM06664
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/23/2018 | NROSS1 | ZONING | REVIEW | Approved | |
| 08/23/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 08/23/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 08/23/2018 | NROSS1 | ENGINEERING | REVIEW | Passed | |
| 08/23/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1.0; General Building Summary: Since this TI increases the area and the occupant load, a new plumbing fixture analysis must be provided. Please include calculations for required water closets, lavatories, and drinking fountains (drinking fountain was not located on the plans). 2. Sheet A2.0; Floor Plan: The new restrooms are required to be accessible. Restroom #117 meets the criteria of the ICC/ANSI Figure 604.3, but restroom #120 does not. Please revise as required. 3. Sheet A4.0; Restroom Elevations 3 (C and D): Please provide the locations of all grab bars per the ICC/ANSI Figures 604.5.1 and 604.5.2. 4. Sheet A5.0; Detail 5: Indicate the bracing size and connections to the top of the partition wall. In addition, extend the detail to indicate how the braces are attached at the structure above. 5. General: Please provide written responses to all review comments. |
| 08/23/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 08/23/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide drinking fountains for the occupants. |
| 08/23/2018 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 09/05/2018 | SVALENZ1 | FIRE | REVIEW | Needs Review |