Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM06662
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/23/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 08/31/2018 | GPERU1 | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a building code evaluation of the project which includes: a. Indicate the occupancy classification of the building in accordance with Chapter 3 of the IBC. 2. Specify the occupant load of the building in accordance with Table 1004.1.2 of the IBC 3. Label all exit doors. 4. The new restroom is required to be accessible; provide an enlarged floor plan of the restroom and show maneuvering clearances and wall elevations of grab bars and dispensers. Show the elevations of plumbing fixtures. 6. Indicate deferred submittals of construction materials and systems not contained in the construction drawings. 7. The main exit from the re-built section of the building cannot exit through the garage. 8. Provide attic ventilation calculations for sizing of attic vents. 9. Detail E on sheet D-1 cannot contain the notation "ANCHOR BOLTS AS NECESSARY"; specify the size and spacing of all anchor bolts. 10. Provide minimum plumbing fixture calculations for required number of restroom facilities based on the occupant load of the building. 11. Specify the occupant loads of adjacent areas of the building. 12. Provide the areas of the new construction and existing building. |
| 08/31/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Show that the new fenestration is NFRC-certified and complies with the requirements of Table C402.3, IECC 2012 for U-factor and solar heat gain coefficient (SFGC). 2. Show that the rooms have adequate ventilation per Section 402 (natural ventilation) or Section 403 (mechanical ventilation). Reference: Section 401, IMC 2012. |
| 08/31/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 08/31/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 09/21/2018 | MMORENO1 | ZONING | REVIEW | Approved | |
| 09/21/2018 | MMORENO1 | ENGINEERING | REVIEW | Passed | |
| 09/21/2018 | SVALENZ1 | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
| 09/21/2018 | SVALENZ1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |