Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T18CM06337
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/27/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
08/27/2018 | CLAYTON TREVILLYAN | PLUMBING-COMMERCIAL | REVIEW | Passed | |
08/27/2018 | CLAYTON TREVILLYAN | ELECTRICAL-COMMERCIAL | REVIEW | Passed | |
08/27/2018 | LMAKUS1 | ZONING | REVIEW | Reqs Change | Plans are stamped preliminary. Provide sealed plans. |
08/27/2018 | PIMA COUNTY | BUILDING-COMMERCIAL | REVIEW | Reqs Change | T18CM05882, 6337 and 6339 - Plan Review Comments Reviewer: Chris Anderson, August 23, 2018 1. Provide structural calculations sealed by the foundation engineer of record, Adam Redd, for foundations. Foundation review will be based on the structural calculation shown they are received. Ref. IBC 107.2.1 2. There appears to be no foundation plan for the smaller building U18SO0121A (T18CM06337). 3. Submit geotechnical reports(s) that the foundation designs were based on. Ref. 2012 IBC 107.2.1 4. No connection details are included in the metal building drawing sets and the headings such as "MZH04 Beams to RF Rafter" in the structural calculations do not correspond top member designations on the roof framing plans and sections. Either revise the roof plans or provided key plans in the structural calculation packages with the column, girder, beam and rafter with component marker that correspond to marker in the structural calculations o that drawings can be reviewed against the calculations. |
08/27/2018 | CTREVIL1 | WATER | REVIEW | Passed | |
08/27/2018 | CLAYTON TREVILLYAN | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
08/27/2018 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
08/27/2018 | CTREVIL1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/29/2018 | AVAUGHN1 | OUT TO CUSTOMER | Completed |