Permit Review Detail
Review Status: Active
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T18CM05913
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/17/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Anchor Test Report; Sheet S.000: The Test Report indicates that APA Solar Racking recommends the helical piles setup to be 3.5" helix at 28" embedment. Sheet S.000 indicates anchor/foundation testing report is site specific and only where required by EOR or AHJ. With the Anchor Test Report indicating the helix criteria for this site, no indication of these anchors was found on the drawings. Are these anchors required for this permit? Please indicate this information on Sheet S.000, and provide the location and anchor specifications on another S-series drawing. 2. Structural Calculations: The structural analysis for the bent anchor post (1.9 x 0.120) was not located in the calculations. Please verify. 3. General: Please provide written responses to all review comments. |
| 08/29/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Provide for an NRTL field evaluation, or show in detail the method and materials used to provide a listed supply side PV interconnection that is verified through the equipment manufacturer as to not compromise the performance and listing of the equipment. NEC 110.3. #2. Provide more detail on the one or three line diagram showing the PV source conductor arrangement for each of the 18 module circuits including the use of listed combiners or j-boxes. Ref; 2012 IBC 107.2.1, 2011 NEC |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/01/2018 | ANY | REJECT SHELF | RECEIVED |