Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM05896
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/09/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
08/14/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A0.2.5; Details 3 and 4: Please indicate a vertical grab bar per the ICC/ANSI Figure 604.5.1. 2. Sheet A0.2.7; Details 5 and 6: Please indicate reinforcing in the wall for the vertical grab bar per the ICC/ANSI Figure 604.5.1. 3. Sheet A0.4.1; Site Plan: The apartment buildings indicate an equivalent 3A construction type. The IBC Section 602.3 identifies Type III constructioin as having exterior walls of non-combustible materials and interior building elements of any material permitted in the code. The exterior walls may consist of fire-retardent treated wood. The 'A' designation indicates a fire protected construction system. Please verify on the drawings this is the type of construction for the apartments. 4. Sheet A0.4.1 (Unit Types); Sheet A1.1 (Site Plan): The Site Plan indicates two accessible units in Building #2 and four accessible units in Building #3, for a total of six accessible units. Sheet A0.4.1 indicates in the table Provided Type A Units three accessible units. Please clarify. 5. Sheet A2.2.1: This sheet is included twice in this set of drawings. Please verify. 6. Sheet A6.1.1; Kitchen Elevation 4B: A section cut below the sink indicates -/A10.1.2. Please finish the cut and revise the sheet reference (no Sheet A10.1.2). 7. Sheet A6.1.1; Bath Elevation 5B: Please add a vertical grab bar at the water closet per the ICC/ANSI Figure 604.5.1. 8. Sheet A6.1.2; Kitchen Elevation 4B: A section cut below the sink indicates -/A10.1.2. Please finish the cut and revise the sheet reference (no Sheet A10.1.2). 9. Sheet A6.1.2; Bath Elevation 5B: Please add a vertical grab bar at the water closet per the ICC/ANSI Figure 604.5.1. 10. Sheet A6.1.3; Kitchen Elevation 4: The elevation on the right requires the elevation mark B, and revise the mark of the left to A. 11. Sheet A6.1.3; Kitchen Elevation 4B: A section cut below the sink indicates -/A10.1.2. Please finish the cut and revise the sheet reference (no Sheet A10.1.2). 12. Sheet A6.1.3; Bath Elevations: Please add an elevation of the restroom side wall. 13. Sheet A6.1.3; Bath Elevations: Both elevations have an elevation mark C. Please revise. 14. General: Please provide written responses to all review comments. |
08/17/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide mechanical ventilation for the apartments. Reference: Section R403.5, IECC 2012. |
08/17/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide third-party listing and material standards for all plumbing fixtures. Reference: Sections 303.4 and 402, IPC 2012. |
08/17/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
08/23/2018 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T18CM05896 - New Building (Tenant Improvement of Menlo Apartment Complex) Building Plan Review (1st Review) Renovation of Units 10 and 11in Building 2 427 N Grande Avenue - O-3 Zoning TRANSMITTAL DATE: August 23, 2018 DUE DATE: August 31, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans but cannot approve them at this time. The proposed modifications to the interior do not affect any zoning requirements and the use of the building and site is not changing. 2. COMMENT: In addition, the building plans must be approved by the PDSD commercial plans reviewers before zoning can approve the plans. 3. COMMENT: Once the plans have been approved by all Commercial Plans reviewers and no site changes are made that affect zoning requirements, zoning will stamp and sign the building plans as it pertains to the zoning review purview. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Building Plans |
08/28/2018 | LOREN MAKUS | ENGINEERING | REVIEW | Passed | |
08/31/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Ref; Plan Sheet E2.1, E2.3. (a) Provide a complete luminaire schedule and 2012 IECC compliance for the new luminaires being installed in the units. (b) Identify the new luminaires with a mark that correlates with the luminaire schedule. (c) Indicate the wiring methods utilized for relocating the sub-panels. #2. Ref Plan Sheet E5.2. The unit panel schedules have a note that says, "SEE UNIT LOAD CALCULATIONS". Where are the calculations? Ref; 2012 IBC section 107.2.1, 2011 NEC |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/05/2018 | QJONES1 | APPROVAL SHELF | Completed |
10/05/2018 | QJONES1 | OUT TO CUSTOMER | Completed |
10/05/2018 | QJONES1 | REJECT SHELF | Completed |