Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM05211
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/05/2018 | MMORENO1 | ZONING | REVIEW | Approved | |
| 07/05/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify the wall covering along the side of the hood. Show that the hood installation complies with Section 507.9, IMC 2012 with regard to a smooth, cleanable, non-absorbent, and non-combustible material installed between the hood and the wall, and extending 18" beyond the hood. 2. Provide structural calculations and details to show that the Type I hood is supported from the building structure in accordance with Section 507.6, IMC 2012 (the hood hanging weight plus the weight of personnel working in or on the hood). Reference: Section 302.1, IMC 2012. 3. Show that the roof top air-conditioning units supplying make up air for the kitchen hood are electrically interlocked to the exhaust fans. Reference: Section 508.1, IMC 2012. |
| 07/05/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 07/05/2018 | MMORENO1 | ENGINEERING | REVIEW | Passed | |
| 07/05/2018 | GPERU1 | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Access to a required public restroom cannot be through a kitchen area. 2. Per IBC 2902.2 separate restroom facilities are required for A-2 occupancy with an occupant load over 15. 3. Structural calculations and details are required for the support of the dead and live load of required kitchen hoods. 4. Provide structural calculations and details for the water heater platform if not supported by floor. 5. Provide an egress plan and show the common path of egress travel and travel distance. 6. Submit enlarged ADA restroom elevations that show grab bars, dispensers, and plumbing fixture heights. |
| 07/05/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 07/05/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide structural calculations for the mounting shelf for the water heater to show that the water heater will be safely supported from the building structure. Reference: Section 301.2, IPC 2012. |
| 07/05/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 07/05/2018 | GPERU1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/19/2018 | QJONES1 | APPROVAL SHELF | Completed |
| 07/19/2018 | QJONES1 | OUT TO CUSTOMER | Completed |
| 07/19/2018 | QJONES1 | REJECT SHELF | Completed |