Permit Number: T18CM05195
Parcel: 14002010A

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T18CM05195
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/23/2018 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
12/03/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Envelope compliance calculations were not found in this submittal. [Second comment: Comment not addressed.] [Initial comment: Demonstrate energy code compliance for the building envelope using calculations based on the current code. Reference: Sections C101.3, C101.5, C103.2, C303, and C401.2, International Energy Conservation Code 2012.]
12/03/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Based on Table 1106.6, IPC 2012, the 5" x 5" gutter is properly sized if the slope is at least 2%; at 0.5% slope, the gutter can only handle an area of 1,250 square feet. [Second comment: Comment not addressed.] [Initial comment: Provide the dimensions of the gutter and downspout. Reference: Sections 1106.1 and 1106.6, IPC 2012.]
12/10/2018 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change T18CM05195

1) Engineering has reviewed the building plans and they appear to be in conformance with the approved DP. Engineering cannot approve the plans as there are outstanding commercial review comments.
2) Engineering can conduct an over the counter review/approval once any outstanding review comments have been addressed and a new work flow opened. Call or Email to schedule

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007
12/10/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
#1. Although the previous electrical plan review comments have been satisfied, it was brought to the attention of the electrical plan reviewer that the Emergency Shower/Eye Wash plumbing fixtures shown on Plan Sheet 3P01.001 and 3P02.001 will require 120V power for the heat strips… Please revise the electrical plan to address this. Provide branch circuiting and update the panel schedules as necessary.
Ref; 2011 IBC 107.2.1, 2011 NEC.
12/13/2018 DAVID RIVERA ZONING REVIEW Approved