Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T18CM05195
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/12/2018 | MARTIN BROWN | FIRE | REVIEW | Reqs Change | Provide a hazardous materials management plan and hazardous materials inventory statement. |
07/16/2018 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
07/23/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet Cover; Drawing Index: The structural sheets in the Drawing Index require change. Please revise. 2. Sheet 3G0.001; Containment Calculations: The calculations do not indicate which B designation on the plan is related to each calculation. Please provide. 3. Sheet 3G0.001; Code Analysis: The analysis indicates 23 occupants, but then notes no occupants and no restrooms required. Please add a note to this sheet indicating per discussion with and approval by the Building Official, this structure will not be accessed by the public, and no occupant load or plumbing fixtures will be required. The Certificate of Occupancy will indicate 0 occupants. 4. Sheet 3G0.001: Please add a north arrow to this sheet. 5. Sheet 3G0.001; Code Analysis: The allowable height indicates three stories, while Table 503 indicates two stories for an H-3/IIB building (before sprinkler increase). Please verify. 6. Sheet 3G0.001; Construction Plan 1; Code Analysis: Please include in the Code Analysis/Stored Material the requirements for control areas as indicated in the IBC Tables 307.1(1), 307.1(2), and 414.2.2. 7. Sheet 3G0.001; Construction Plan 1; Code Analysis: Please include in the Code Analysis/Stored Material the requirements for the fire resistance rating of the separation walls (fire barriers) as indicated in the IBC Table 414.2.2. 8. Sheet 3G0.001; Stored Material: Please verify on the drawings the need for explosion control (IBC Section 414.5.1), monitor control equipment (IBC Section 414.5.2), emergency/stand by power (IBC Section 414.5.3), separation distance (IBC Sections 414.6.1.2, 415.5.1.3, and 415.5.1.4), detached building (IBC Table 415.5.2), and other issues in the IBC Section 415.9. 9. Sheet 3G0.001; Code Analysis: Please provide a reference to the following code sections for fire barriers, and indicate on the drawing all of these requirements have been met on this project. Provide details and specifications as required: Openings in fire barriers (IBC Section 707.6); Penetrations through fire barriers (IBC Section 707.7); Joints in fire barriers (IBC Section 707.8); Voids in fire barriers (IBC Section 707.9); Ducts and air transfer openings in fire barriers (IBC Section 707.10); Penetrations in fire barriers (IBC Section 714); Fire resistant joint systems in fire barriers (IBC Section 715); Opening protectives in fire barriers (IBC Section 716); Ducts and aire transfer openings in fire barriers (IBC Section 717). 10. Sheet 3S0.001; General Structural Notes (Special Inspections): The City of Tucson requires all lettering (upper and lower case) to be a minimum of 3/32" in height. Please revise. 11. Sheet 3S0.001; General Structural Notes (Foundations): Please provide one copy of the soil report for review. 12. Sheet 3S2.001; Foundation Plan (boxed note): Please add to the note "The final sealed metal building plans and forces must follow the IBC Section 107.3.4.1 for processing deferred submittals". 13. Sheet 3S2.001; Hairpin Detail A: Please reference Keynote 02 for the reinforcing. 14. Sheet 3S2.001 (Isolated Footing Schedule); Structural Calculations: Please provide a calculation for the footings referenced as F2 in the schedule. 15. Sheet 3S2.001; Foundation Plan: Should the interior masonry wall between Grids 5 and 6 be noted as MW1? Please verify. 16. Sheet 3S2.001; Foundation Plan: Please indicate the column footing reference for footings at Grids 1/D and 1/F. 17. Sheet 3S3.001; Detail 110: The space between the fire barrier wall and the exterior wall must be fireblocked per the IBC Sections 707.5.1 and 718.2. Please indicate those requirements on this detail. 18. Sheet 3S3.001; Detail 108: The joints between the fire barrier wall and the exterior wall must meet the requirements of the IBC Sections 707.8 and 715. Please indicate those requirements on these details. 19. Sheet 3A2.100; Door Schedule: The door hardware was not located in these drawings. Please add or indicate a reference on this sheet. 20. Sheet 3A4.001; Elevation 1: Please add the building section cut 2/3A5.001 on this elevation. 21. Sheet A6.001; Detail 1: Please indicate on the Construction Plan (Sheet 3A2.100) typical locations for Detail 1. 22. Sheet A6.001: Please indicate all details on this sheet on plans or sections, or reference the Structural Sheet 3S3.001. 23. General: Please provide the Special Inspection Certificate. 24. General: Please provide written responses to all review comments. |
07/24/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Verify that adequate dynamic water pressure (30 - 90 PSI) is available for proper operation of the emergency showers. Reference: Sections 303.2 and 604.3, IPC 2012. 2. Provide calculations showing how the water supply piping has been sized. Note that emergency eyewashes and showers have continuous supply demands (20 GPM for the Haws 8300 FP) and the use of plumbing fixture units is not appropriate. Reference: Sections 604.1 and 604.3, IPC 2012. 3. The emergency shower/eyewash specification calls for the installation of a Haws model 9201H tempering valve. Provide an installation detail and show the source of hot water. Reference: Section 303.2, IPC 4. Provide a freeze-proof emergency shower/eyewash that does not rely upon below-grade stop-and-waste valves. Reference: Section 608.7, IPC 2012. 5. Provide the dimensions of the gutter and downspout. Reference: Sections 1106.1 and 1106.6, IPC 2012. |
07/24/2018 | ROBERT SHERRY | WATER | REVIEW | Passed | |
07/25/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Demonstrate energy code compliance for the building envelope using calculations based on the current code. Reference: Sections C101.3, C101.5, C103.2, C303, and C401.2, International Energy Conservation Code 2012. 2. Show how one of the "Additional Efficiency Package Options" (C406, IECC 2012) is to be accomplished. Reference: Section C401.2, IECC 2012. 3. Provide heating and cooling load calculations, using the exterior design conditions shown in Section 302.2, IECC 2012, as modified by the City of Tucson. 4. Secure the refrigerant circuit access ports of the condensing units to prevent unauthorized access. Reference: Section 1101.10, IMC 2012. 5. Coordinate the location of EF-2 with the architectural building elevations. Reference: Section 107.2.1, IBC 2012. |
08/01/2018 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T18CM05196 - New Building #3 (Truck Depot Parking - TEP) Related to DP18-0088 Building Plan Review (1st Review) Tucson Electric Power 3950 E Irvington Road - Zoning is PAD 34 / per Rezoning Case C9-18-03 TRANSMITTAL DATE: August 1, 2018 DUE DATE: August 8, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans for compliance with the approved version of the development package. While the building footprint is consistent with the DP as it relates to the zoning review purview (Building footprint, Height, square footage, site conditions etc.) zoning cannot approve the building plans until the building plans have been approved by the 3rd Party and PDSD Commercial Plans Reviewers. 2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. 3. COMMENT: If any changes are necessary, due to the 3rd Party and PDSD Commercial Plan Reviewer's comments that affect or change the building footprint, height, or square footage, the DP will need to be updated prior to approval of the building plans by Zoning. 4. COMMENT: Once the plans have been reviewed and approved by the 3rd Party and PDSD Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning. 5. COMMENT: Label the height of the north wall on the elevation and cross section drawings. The maximum height proposed and approved on the DP is 27 feet. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: building plans |
08/01/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Distinguish between new and existing electrical equipment on the One Line Diagram. #2. Specify the location of '2SES'. #3. Provide for a UFER (concrete encased grounding electrode) and other bonding required at the new building. NEC 250.50, 250.32, 250.104 #4. Provide complete compliance with the Tucson/Pima County Outdoor Lighting Code for the exterior lighting. #5. Provide complete load calcs for the electrical service including the new panels. #6. Provide complete compliance with the 2012 IECC for the lighting. Ref; 2012 IBC 107.2.1, 2011 NEC |
08/01/2018 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | T18CM05195 1) Engineering has reviewed the building plans and they appear to be in conformance with the approved DP. Engineering cannot approve the plans as there are outstanding commercial review comments. 2) Engineering can conduct an over the counter review/approval once any outstanding review comments have been addressed and a new work flow opened. Call or Email to schedule John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/20/2018 | SVALENZ1 | OUT TO CUSTOMER | Completed |