Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T18CM05120
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/29/2018 | GPERU1 | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide the minimum plumbing fixtures required based on the total occupant load for the church. 2. Provide structural calculations for the new addition; provide calcs. for the lintel and masonry walls, footing and foundation. 3. The water closet in the mens toilet room is requred to have a 5 ft. clear space around it; show this on an enlarged floor plan. 4. The door to the mens remodeled restroom requires a clear space on the strike side of the door if it is self closing and latching. 5. Specify the total area of the building with the addition and verify that it is within the maximum allowable area for occupant type and construction type. |
06/29/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide specifications for the plumbing fixtures. 2. Provide metering faucets for the lavatories. The faucets shall deliver a maximum of 0.25 gallons per cycle. The delivery cycle shall last at least 10-seconds. 3. Provide tempered water to each lavatory using a thermostat listed to ASSE 1070. 4. Provide a waste and vent riser diagram. |
06/29/2018 | KLEE1 | ENGINEERING | REVIEW | Passed | |
06/29/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
06/29/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
06/29/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide specifications for the new restroom exhaust fan. Provide a sequence of operation and balancing data for all fans. |
06/29/2018 | KELLY LEE | ZONING | REVIEW | Reqs Change | Development Package required |
07/09/2018 | KROBLES1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | PER ENEWCOMB |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/09/2018 | KROBLES1 | OUT TO CUSTOMER | Completed |