Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM05106
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/03/2018 | GPERU1 | BUILDING-COMMERCIAL | REVIEW | Approved | |
07/03/2018 | GPERU1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
07/03/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1.Comment not resolved. If you want to connect the fixture drain of the drinking fountain to the vent of the mop sink, use a common vent, [Initial comment: Revise the venting configuration for P4 and P-5 in the partial waste & vent diagram: either show the fixtures as being common vented or provide two individual vents (using air admittance valves).] 2. Comment not resolved. State the mounting height for each drinking fountain. [Initial comment: One of the two drinking fountains is to be mounted with maximum a spout height of 36" AFF and the other with a spout height of 38-43" AFF. Reference: Section 602.4, ANSI/ICC A117.1-2009.] 3. Provide structural calculations to verify that the proposed framework will safely support the water heater. Include fastening details. [Initial comment: Provide architectural detail showing how to anchor water heater bracket to wall.] |
07/05/2018 | KROBLES1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
07/05/2018 | KROBLES1 | FIRE | REVIEW | Needs Review |