Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM04990
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/26/2018 | MMORENO1 | ZONING | REVIEW | Approved | |
06/26/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
06/26/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
06/26/2018 | MMORENO1 | ENGINEERING | REVIEW | Passed | |
06/26/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1; Partition Notes: Note 3 references Sheet A9. Please revise that sheet reference. 2. Sheet A1; Equipment Plan: At the sales desk, a note indicates to buildi an existing step out. Please clarify. 3. Sheet A1.1; Details 4 and F6: These details reference the plan for partition stud size and spacing. Where on the plan are the new partition stud sizes indicated? 4. Sheet A1.1; Detail 4: Please provide kicker size, and indicate the number and size of screws attaching the brace to the stud. 5. Sheet A1.1; Detail 4: Please extend the detail to the roof and indicate how the brace is connected to the structure above. 6. Sheet A2; Elevation D (Renovation): Please indicate the new awning is a deferred submittal by others. 7. Sheet D1; Demolition Plan: Please indicate the wall at the subway seating area (see Sheet A1). Is this wall being demolished? Please verify. 8. General: The City of Tucson requires all lettering (upper and lower case) to be a minimum of 3/32" in height. Please revise all sheets. 9. General: Please provide written responses to all review comments. |
06/26/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
06/26/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
06/26/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
06/26/2018 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |