Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM04825
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/20/2018 | ALEXANDRA HINES | ZONING | REVIEW | Approved | |
| 06/20/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide a mechanical plan including ventilation calculations. |
| 06/20/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide electrical service information such as; (a) Voltage and Phase (b) Amp and AIC rating. Ref: 2012 IBC sec 107.2.1, 2011 NEC |
| 06/20/2018 | AHINES2 | ENGINEERING | REVIEW | Passed | |
| 06/20/2018 | GPERU1 | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. All exit doors are required to be of pivoted or side hinged type; horizontal sliding doors are not allowed to be used for exit doors. 2 The route to required public toilet facilities is not allowed to pass through storage rooms. 3. Separate plumbing fixtures are required for each sex when the occupant load is over 15. 4. Where showers are provided they shall be accessible; provide specifications for ADA shower. 5. Restroom #2 is required to be accessible; show maneuvering clearances in restroom. 6. Water fountains are required for persons in wheelchairs and standing. Option is to provide a point of use dispensing station located where accessible and plumbed with water service. |
| 06/20/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 06/20/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | If the shower does not have a pre-fabricated receptor, provide details to show that the construction of the receptor complies with the requirements of Section 417.5.2, IPC 2012. |
| 06/21/2018 | QJONES1 | FIRE | REVIEW | Needs Review | |
| 06/21/2018 | QJONES1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/21/2018 | QJONES1 | APPROVAL SHELF | Completed |
| 06/21/2018 | QJONES1 | OUT TO CUSTOMER | Completed |
| 06/21/2018 | QJONES1 | REJECT SHELF | Completed |