Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T18CM04825
Parcel: 141185930

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T18CM04825
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/20/2018 ALEXANDRA HINES ZONING REVIEW Approved
06/20/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Provide a mechanical plan including ventilation calculations.
06/20/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please provide electrical service information such as;
(a) Voltage and Phase
(b) Amp and AIC rating.
Ref: 2012 IBC sec 107.2.1, 2011 NEC
06/20/2018 AHINES2 ENGINEERING REVIEW Passed
06/20/2018 GPERU1 BUILDING-COMMERCIAL REVIEW Reqs Change 1. All exit doors are required to be of pivoted or side hinged type; horizontal sliding doors are not allowed to be used for exit doors.
2 The route to required public toilet facilities is not allowed to pass through storage rooms.
3. Separate plumbing fixtures are required for each sex when the occupant load is over 15.
4. Where showers are provided they shall be accessible; provide specifications for ADA shower.
5. Restroom #2 is required to be accessible; show maneuvering clearances in restroom.
6. Water fountains are required for persons in wheelchairs and standing. Option is to provide a point of use dispensing station located where accessible and plumbed with water service.
06/20/2018 ROBERT SHERRY WATER REVIEW Completed
06/20/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change If the shower does not have a pre-fabricated receptor, provide details to show that the construction of the receptor complies with the requirements of Section 417.5.2, IPC 2012.
06/21/2018 QJONES1 FIRE REVIEW Needs Review
06/21/2018 QJONES1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
06/21/2018 QJONES1 APPROVAL SHELF Completed
06/21/2018 QJONES1 OUT TO CUSTOMER Completed
06/21/2018 QJONES1 REJECT SHELF Completed