Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: T18CM04501
Parcel: 12709011M

Review Status: Active

Review Details: COMMERCIAL - TI

Permit Number - T18CM04501
Review Name: COMMERCIAL - TI
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
06/11/2018 EHAMBLI1 ZONING REVIEW Approved
06/11/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
06/11/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please provide a complete panel schedule for panel '2L'.
Ref; 2012 IBC sec 107.2.1, 2011 NEC art. 408.4
06/11/2018 JOHN VAN WINKLE ENGINEERING REVIEW Passed
06/11/2018 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet X1.0 (Title); Sheet X1.0 (Location Plan): The Location Plan indicates Suite #201, while the Title indicates Suite 215. Please coordinate.
2. Sheet X1.0 (Location Plan); Sheet A1.0 (Reference Floor Plan): The Location Plan indicates Suite #201, while the Floor Plan indicates 100 series room identifications. Please verify.
3. Sheet A1.0; Partition B: The top of the partition should extend to the deck or be braced. Please verify and add detail as required.
4. Sheet A1.0; Partition C: The top of this partition must have braces indicated. Please provide detail.
5. Sheet A1.0; Partition C: The detail at the top of the storefront references 2/A2. Please revise that reference.
6. Sheet A4.0; Room Finish Schedule: Revise the Room Marks as required (this is second floor).
7. General: Please provide written responses to all review comments.
06/11/2018 ROBERT SHERRY WATER REVIEW Completed
06/11/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Reprint sheet P3.1
06/11/2018 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
06/12/2018 MARTIN BROWN FIRE REVIEW Approved