Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM04425
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/07/2018 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
| 06/07/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating/cooling load calculations for the new split-system AC unit. 2. Provide mechanical ventilation for the suite. Reference: Section R403.5, IECC 2012. 3. Show the size, route, and termination of the condensate drain from the split-system fan coil unit. 4. Show the exhaust flowrate for the range hood. 5. Provide the air infiltration rate for all windows, skylights, and sliding doors as tested per NFRC 400 or AAMA/WDMA/CSA 101/IS2 A440. Reference: Section R402.4.3, IECC 2012. 6. The residential provisions of the 2012 International Energy Compliance Code are the controlling energy code requirement for this project. Show that the construction complies with the requirements of R401.2, IECC 2012 (i.e. provide REScheck). Reference: Section R101.5, IECC 2012. |
| 06/07/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please revise the 2012 IECC compliance. Should be per section R404.1. |
| 06/07/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 06/07/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1.0; Project Data: Please indicate the occupant load on the drawings for this new unit. 2. Sheet A2.0; Wall Legend: The new wall indicates to see Detail 5/A4.0. Please revise the detail reference. 3. Sheet A3.0; Elevation 4: Per the ICC/ANSI Section 608.2.3.2, a seat is required in the shower. Please indicate the seat on the plan and elevation. 4. Sheet A3.0; Elevation 4: Please indicate the control location on the drawings per the ICC/ANSI Section 608, or reference Sheet A4.0 for that information. 5. Sheet A3.0; Elevation 3: Please indicate the control location on the drawings per the ICC/ANSI Section 608, or reference Sheet A4.0 for that information. 6. Sheet A4.0; Elevation 4: Please locate the control area from the wall per the ICC/ANSI Section 608. 7. General: Please provide written responses to all review comments. |
| 06/07/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | If the showers do not have pre-fabricated receptors, provide details to show that the construction of the receptors complies with the requirements of Section 417.5.2, IPC 2012. |
| 06/08/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 08/27/2018 | AVAUGHN1 | ZONING | REVIEW | Reqs Change | |
| 08/27/2018 | AVAUGHN1 | ENGINEERING | REVIEW | Reqs Change |