Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/WWM
Permit Number - T18CM04309
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/WWM
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/26/2018 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T18CM04309 New SFR (1st Review) 523 S. Russell Avenue - HC-3 Zone TRANSMITTAL DATE: September 26, 2018 DUE DATE: September 27, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 01. COMMENT: This plan was reviewed over the counter at time of submittal and zoning comments were provided to the applicant regarding the HPZ review that is required. 02. COMMENT: Include a lot coverage calculation. Lot coverage includes all enclosed structures, detached accessory structures, vehicle use areas etc. 03. COMMENT: Draw and label the four parking spaces required for this development. 04. COMMENT: List as a general note the HPZ case number, date of approval and modifications approved. Include a copy of the PDSD signed HPZ decision letter with the next submittal and the HPZ stamped plans. 05. COMMENT: Incorporate in the plans any conditions of approval such as detail drawings or specific notes. 06. COMMENT: Review the site plan and assure that it has been drawn correctly. The plan depicts two property lines that contradict the location of the street property line. Also it is not clear that the street parking is actually on the street and whether or not parking is allowed on Russell. Provide documentation from TDOT that states that street parking is allowed on Russell. 07. COMMENT: Label the zoning classifications adjacent to the property. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Building Plans |
09/26/2018 | DAVID RIVERA | NPPO | REVIEW | Passed | |
10/03/2018 | LOREN MAKUS | ENGINEERING | REVIEW | Passed | |
10/10/2018 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Reqs Change | T18CM04309 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, please provide two sets of updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2012 International Residential Code and 2012 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL COMMENTS: 1. Show compliance with the Inclusive Home Design Ordinance adopted by the City of Tucson Ordinance #10463 on 10/16/2007. Notate accessible route, minimum door width, changes in floor elevation, door hardware, electrical outlet reach range, grab bar reinforcement, etc. 2. All SFR and Duplex plans submitted after March 1, 2009 require a solar water system, or future installation preparation City of Tucson Ordinance #10549 with one of the following provisions: ½"control conduit and two ¾" copper piping for water with rooftop termination; straight 3" capped sleeve; or an accessible attic (clear path 30" wide x 30" high) over the water heater. Show appropriate notation. 3. All SFR and Duplex plans submitted after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 with the following provisions: 1. A 4 square feet area for (meter, disconnect & inverter) equipment adjacent to the electrical service panel or near the proposed collector panel space. 2. The best roof space available for accommodating PV solar collector panels with capacity for collector dead loading (typically 4 lbs/SF). 3. A minimum 3,800 volt-ampere PV electrical load entry on the Service Load Calculation (Show as a continuous load of 15.8 A). 4. An Electrical Panel Schedule with a 240 volt circuit breaker space labeled "reserved for Photo Voltaic". See electrical comments. 4. All construction drawings submitted after June 1, 2010 for one- or two-family dwellings must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. Property with 200 to 400 SF of available distribution area requires piping for one gray water fixture, and a property with over 400 SF requires complete compliance. Include two clothes washer standpipes, one with an above grade stub-out, and one to the building drain; also provide gray drain-line discharge of all second story bathing fixtures through an exterior-wall drop for future gravity distribution. Include an aliened purple colored 2" vertical drop to a cleanout cap 2' above grade. The home owner may perform system alteration for future gray water usage. Or, notate "Gray water provision not required only when property has less than 200 SF available for gray water distribution." Add the appropriate detail found at the web site: https://www.tucsonaz.gov/files/pdsd/codes-ordinances/Grey_Water_Options_FINAL_.pdf 5. An addressed living unit requires collection of development impact fee when the building permit is processed, City of Tucson Ordinance #11203. SITE PLAN: 1. Indicate the location of utility meters and gas, water, electric and sewer lines from property line to building, R106.1.1. Show the point of connection of proposed lines to the utility service for verifying correct sizes and necessary upgrades. 2. Show compliance with the Pool Barrier requirement by including a pool alarm system for doors and windows open to the pool, or show a continuous barrier around the pool, 2012 IRC Appendix G. FLOOR PLANS: 1. Show a maximum ½" floor elevation change at a notated accessible route entrance on the floor plan, R106.1.1. Include the threshold condition at the vehicle doorway or an exterior hinged door when the garage is used for the accessible route. 2. Show attic access with 20-minute fire rating for separation between the dwelling attic and garage, R302.6. Update door #4. 3. Show compliance with R310 providing egress from the master bedroom. Update window #G. SECTIONS - DETAILS: 1. An unvented roof assembly requires an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing, R806.5. Show a roof design with insulation types and minimum thickness for meeting the condensation control requirement and the minimum total insulation value of R-38. PLUMBING PLANS: 1. Show hot water pipe with minimum R-3 insulation, N1103.4.2. 2. Show an individual accessible water supply shut off for each dwelling unit, P2903.9.1. 3. Show the building cleanout location, P3005.2. MECHANICAL PLANS: 1. Provide (an HVAC system with) whole-house mechanical ventilation with continuous or a minimum controlled intermittent airflow rate, R303.4 & M1507.3. Show a source of outside supply air or continuous exhaust fan function. 2. Provide demand calculations in accordance with Manual J/S/D standards, M1401.3, M1601.1. Systems shall be sized in accordance with Manual S based on building loads calculated in accordance with Manual J and duct systems sized in accordance with Manual D. Notate if the mechanical system calculations may be provided by deferred submittal. The deferred calculations must be approved through revision process prior to mechanical inspections. 3. Show dryer vent size and location for venting to exterior, M1501. ELECTRICAL PLANS: 1. Show the location of the service and distribution panel on the Electrical Plan, E3404.12. OUTDOOR LIGHTING CODE 1. Show the proposed fixture as full cut-off FCO style, or provide an Outdoor Lighting Calculation including all exterior fixtures on the property for determining exterior lighting limits. Adjustable security light fixtures are unshielded, not FCO. If you have any questions please contact: Ken Van Karsen (520) 837-4912 City of Tucson Residential Plan Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/02/2018 | QJONES1 | APPROVAL SHELF | Completed |
11/02/2018 | QJONES1 | OUT TO CUSTOMER | Completed |
11/02/2018 | AVAUGHN1 | REJECT SHELF | Completed |