Permit Number: T18CM04115
Parcel: 140280560

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T18CM04115
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/30/2018 EHAMBLI1 ZONING REVIEW Approved
05/30/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. The portion of the building shell being modified in this activity does not appear to have been conditioned. Section C101.4.5, IECC 2012 requires the space to be brought into full compliance with the current energy code. Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2, C401.2, and C406, International Energy Conservation Code 2012.
2. Show how outside air is to be introduced into the ofice and break room. Reference: Section 107.2.1, IBC 2012.
3. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C302.2, C403.2.1, and C403.2.2, IECC 2012 as amended by the City of Tucson, and Section 312.1, IMC 2012.
4. Show the size, route, and termination of the condensate drains (not shown on the plumbing drawing). Reference:Section 307.2.1, IMC 2012 as amended by the City of Tucson.
05/30/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
#1. Provide the required disconnecting means and OCPD's for the evap cooler motors and pumps as required per 2011 NEC art 430.
05/30/2018 EHAMBLI1 ENGINEERING REVIEW Passed
05/30/2018 GPERU1 BUILDING-COMMERCIAL REVIEW Approved
05/30/2018 ROBERT SHERRY WATER REVIEW Completed
05/30/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
05/31/2018 MARTIN BROWN FIRE REVIEW Approved
06/05/2018 SVALENZ1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed