Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T18CM04035
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/20/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | This project has been classified as a Group R-2 occupancy. 1. Indicate the proper use of the building, ie; apartments. IBC 310.4. 2. Sheets a000, a001 The code sections which have been cited on the specifications are from the INTERNATIONAL RESIDENTIAL CODE. The project has been designated a Group R-2 occupancy and is regulated by the INTERNATIONAL BUILDING CODE. Provide specifications from the appropriate international code sections. 3. Type A units and Type B units shall be provided in apartment houses. IBC 1107.6.2.1. 4. In apartment complexes containing more than 20 dwelling units, at least 2 percent but not less than 1 of the units shall be a Type A unit. All apartment units on site shall be considered to determine the total number of units and required number of Type A, and Type B units which shall be dispersed among the other units. IBC 1107.6.2.1.1 5. Specify the number of Type A and B units and show the dispersion of units on an over-all site plan. IBC 1107.6.2.1.1 6. Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the new buildings to the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012. 7. Sheet a00 Provide a list of deferred submittal items that include roof and floor trusses, and any other applicable portions of the design documents that are not submitted at time of application. IBC 107.3.4.1. 8. Sheet as1.1 The SETBACKS distances that are listed in the section call out a 21 ft. front setback, however the distance between the buildings is shown to be 26'-4". Specify how the front setback distance is measured relative to the separation between the buildings and property line location. Coordinate the side and rear setbacks with the dimensions shown on Sheet as1.1. IBC 107.2.1. 9. Sheet a401 contains a detail for a "typical area separation fire wall, 2-hr rated", yet this wall detail is not called out in any of the floor plans. If this is in fact a fire wall meant to separate the dwelling units as in a townhome construction, then it would be regulated by the International Residential Code. Specify the use and location of the fire wall, or remove it from the plans. 10. Sheet a100 Wall type W-05 is being described as a demising frame wall that must be identified as a fire resistive assembly for separation between dwelling units. IBC Section 708.1 requires a fire partition rating of ½ hour in buildings of type VB construction in fully sprinklered buildings. IBC 708.1 11. Sheet a103 Enclosed attic spaces where ceilings are applied directly to the underside of roof framing members is required to have cross ventilation. Provide attic vent calculations and specify the type and number of ventilation openings. IBC 1203.2. 12. Sheet a100 Single or multiple-station smoke alarms shall be installed on the ceiling or wall in the immediate vicinity of bedrooms, in each room used for sleeping purposes and in each story within a dwelling unit. Show required smoke alarms on the architectural floor plan. IBC 907.2.11.2. 13. Sheet a100 A carbon monoxide alarm is required in each dwelling unit because it contains an attached garage. The alarm must be listed in accordance with NFPA 720 and installed per manufactured specifications. IBC 908.7 14. Sheet as100 Under the project info heading, clarify "2 FIRE SEPARATION AND FIRE RESISTANCE", what is this in reference to? IBC 107.2.1. 15. Sheet as1.1 Provide over-all dimensions of the entire building; specify the building total square footage. IBC 107.2.1. 16. Sheet a100 Door openings between a private garage and the dwelling unit shall be solid wood doors or solid or honeycomb steel doors not less than 1-3/8" in thickness, self-closing and self-latching. Provide door specifications on door schedule. IBC 406.3.4. 17. Sheet cs100 Cite the correct code section referenced for the construction and installation of automatic sprinkler systems. Section 903.2.1.2 is used for Group A-2 occupancies. IBC 903.2.8. 18. Sheet a200 Correct the referenced detail for steel railings. The keynote specifies detail 7/a106 which is the detail for trellis railing. IBC 107.2.1. 19. Sheet a301 Walls and soffits within enclosed usable spaces under stairs is required to be protected by not less than ½" gypsum board. Specify requirement in stair detail 3. IBC 1009.3. 20. Sheet a100 Window W1 2030 that is within 24 inches of the door is required to be safety glazing. IBC 2406.4.2. 21. Sheet a401 Specify the required clearance dimension from the bottom of the stucco to the paved surface. IBC 1408.4.1 22. Provide description and details for anchorage of interior non-bearing walls to the slab/floor and roof/ceiling. IBC 107.2.1 23. Specify the height-elevation of the garage slab, exterior slabs and washer/dryer platform in the garage relative to the finish floor elevation. IBC 107.2.1 24. Provide a copy of the geotecnical report. 25. Sheet S002 The SYMBOLS, PLAN ABBREVIATIONS, MATERIAL table does not contain legible font. IBC 107.2.1 26. Correct all references from the 2015 IBC to the 2012 IBC on the structural calculations. IBC 107.2.1 27. Sheet S302 Detail 313 references STEEL BASE PLATE PER DETAIL 327, which is not shown on the plans. Provide detail or correct reference. IBC 107.2.1 30. Please provide written responses to all plan review comments. Submit a copy of the review comments with the responses included. |
| 07/20/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the plumbing fixture schedule to coordinate the number of fixtures with the drawings (e.g., each unit has five water closets and there are four units per building therefore there are 20 water closets per building, not 32). Reference: Section 107.2.1, IBC 2012. 2. Provide a site drawing showing the location of the proposed size, route, and slope of the building sewer, the location of all cleanouts in the building sewer, and the location of the connection of the building sewer to the public sewer. Reference: Section 107.2.1, IBC 2012. 3. Horizontal branches shall connect no closer than ten diameters downstream of the bases of vertical stacks. Reference: Section 704.3, IPC 2012. 4. Provide the rim elevation of the next upstream sanitary manhole and the first floor elevation. Determine the need for a backwater valve per Section 715.1, IPC 2012, as amended by the City of Tucson. 5. Clarify the storm drainage calculations on sheet A103. There are no scuppers on the building. Provide the slope of the proposed gutters and consider the roof area that is tributary to each downspout when determining the gutter size. |
| 07/20/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. The residential provisions of the 2012 International Energy Compliance Code are the controlling energy code requirement for this project. Reference: Section R101.5, IECC 2012. 2. Provide calculations for the building envelope to demonstrate compliance with the energy code (e.g., REScheck or COMcheck); use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. As a minimum, the information shall include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections R103.2 and R401.2, International Energy Conservation Code 2012. 3. Show how the building envelope is to be constructed to limit the air leakage per the requirements of Section R402.4, IECC 2012 4. Specify the required U-factors and Solar Heat Gain Coefficients (SHGC) for the fenestration and doors on the architectural drawings. Reference: Section R303.1.3, IECC 2012. 5. Coordinate the attic access for the fan coil units with the architect. Provide adequate maintenance space and clearance to allow removal of each fan coil. Verify the installation of a switched luminaire and convenience receptacle for maintenance purposes. Reference: Sections 306.1, 306.3, and 306.3.1, IMC 2012. 6. Secure the refrigerant circuit access ports of the condensing units to prevent unauthorized access. Reference: Section 1101.10, IMC 2012. |
| 07/20/2018 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Verify the need for a reduced pressure backflow preventer at the water meter with Tucson Water. 2. Show the location of the proposed water meter and the water service pipe on a site plan. Reference: Section 107.2.5, IBC 2012. |
| 07/23/2018 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
| 07/24/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Ref; Plan Sheet 'es1.0'. (a) Locate the electric gate and controller on the electrical site plan. (b) Provide bolder print with a minimum text size of 3/32 of an inch for the notes pointing to various equipment. Due to text size and light print, these notes are hard to read. #2. Ref; Plan Sheets 'E200', 'E201'. (a) Locate and identify the location of the required smoke detectors and assign a branch circuit and panel. Also correlate with the symbols legend. NEC art 408.4. (b) Provide for Tamper Resistant receptacles and AFCI protected branch circuits. NEC art's 210.12, 406.12 (c) The first floor power plan shows devices located in the dining room wall opposite the laundry room designated to Branch circuit #9. The symbol for these devices is not found in the symbols legend. (d) On plan sheet 'e201. What does "rcp" stand for at the bottom of the sheet? Please clarify. #3. Ref; Plan Sheet 'E400'. (a) Indicate whether the electrical service equipment is fed overhead or underground from the serving utility. If overhead an approved underground service waiver will be required. 2012 IBC section 112.1.1 City Amendments to the IBC. Ref; 2012 IBC sec 107.2.1, 2011 NEC, City of Tucson Commercial Plan Submittal Requirement. Dan.santacruz@tucsonaz.gov |
| 07/26/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 08/08/2018 | EHAMBLI1 | ZONING | REVIEW | Reqs Change | FROM: Elisa Hamblin, AICP Lead Planner PDSD Zoning Review Section PROJECT: T18CM04035 and T18CM04039 - New Apartment Building Building Plans (1st Review) 1129 E. 7th Street TRANSMITTAL DATE: August 8, 2018 DUE DATE: August 15, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans but cannot approve them at this time. The proposed setback for the side (east and west) perimeter yard setback to the patio covers cannot be verified. No dimension was provided on the approved development package. The side (east and west) perimeter yard setback is regulated at 10' or 3/4 the height of the structure. 2. COMMENT: The applicant may reduce the size of the pergola structures to meet the required 10' setback. This must be illustrated on the building plans with all applicable dimensions. 3. COMMENT: If the applicant wishes to keep the proposed pergolas at 9'2" from the property line, they will have to request a reduced setback through the Design Development Option (DDO) for each structure. Please contact Zoning Review for more information. 4. COMMENT: When corrections are made to the building plans, a simple walk-through review can be completed at the Zoning Review Counter. If you have any questions please contact me at Elisa.Hamblin@tucsonaz.gov or (520) 837-4966. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised building plans. |
| 08/13/2018 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | T18CM04035 1) Engineering has reviewed the building plans and they appear to be in conformance with the approved DP. Engineering cannot approve the plans as there are outstanding commercial review comments. 2) Engineering can conduct an over the counter review/approval once any outstanding review comments have been addressed and a new work flow opened. Call or Email to schedule John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/26/2018 | AVAUGHN1 | OUT TO CUSTOMER | Completed |