Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM03750
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/10/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 07/11/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 07/11/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Circuit vent connections shall be installed per Section 905 (specifically 905.4), IPC 2012. Are you sure that you want to use a circuit vented system rather than a combination waste and vent system? Coordinate the plumbing fixtures shown on the riser diagram with those shown on the plumbing waste floor plan (no trench drains are on the riser diagram). Reference: Section 914.2, IPC 2012. [Initial comment: The circuit vent connection must be located between the two most upstream fixture drains, not as shown on the plans. IPC 914.2, Sht. P-1] 2. Correct the location of the vent for the grease interceptor on sheet P-1 (the vent should connect on the downstream end of the grease interceptor). [Initial comment: A 2" vent is required on the discharged on the discharge drain to the grease trap. IPC 1003.9, Sht. P-3] |
| 07/11/2018 | GPERU1 | ELECTRICAL-COMMERCIAL | REVIEW | Approved |