Permit Number: T18CM03598
Parcel: 121110660

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T18CM03598
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/10/2018 MCASTRO2 ZONING REVIEW Approved
05/10/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Infiltration may not be used to satisfy the required makeup air for the kitchen hood. Reference: Section 501.4, IMC 2012.
2. Provide structural calculations and details to show that the Type I hood is supported from the building structure in accordance with Section 507.6, IMC 2012 (the hood hanging weight plus the weight of personnel working in or on the hood). Reference: Section 302.1, IMC 2012.
3. Show that the hood installation complies with Section 507.9, IMC 2012 with regard to a smooth, cleanable, non-absorbent, and non-combustible material installed between the hood and the wall, and extending 18" beyond the hood.
4. Verify that the evaporative cooling section of the makeup air unit is equipped with a recirculating water system. Reference: Section 928.2, IMC 2012 and ARS Title 45, Chapter 1, Article 12. See text at: (http://www.azleg.gov/viewdocument/?docName=http://www.azleg.gov/ars/45/00313.htm).
05/10/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
05/10/2018 MCASTRO2 ENGINEERING REVIEW Passed
05/10/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Revise the specifications for the automatic faucet for the lavatories to require a maximum 0.25 gallons to be dispensed per metering cycle. Verify that the automatic faucet will operate for a minimum time of 10-seconds. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.
05/10/2018 ROBERT SHERRY WATER REVIEW Completed
05/10/2018 MARTIN BROWN FIRE REVIEW Approved
06/11/2018 ARUIZ1 BUILDING-COMMERCIAL REVIEW Needs Review
06/11/2018 ARUIZ1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review