Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM03417
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/11/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Verify the gas pressure provided by Southwest Gas. If it is not 2 PSI, either resize the piping based on 7" WC intial pressure (Table 402.4 (2), IFGC 2012) or obtain 2 PSI service and install a pressure regulator at the gas meter to obtain 8" WC initial pressure. |
| 05/11/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the specified HVAC systems controls to ensure that they are capable of automatically adjusting the start time of the HVAC equipment in order to bring the interior conditions to the desired temperature at the start of occupancy. Reference: Section C403.2.4.3.3, IECC 2012. 2. Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted (i.e. all of the air supplied to each restroom is to be exhausted during the hours of operation even if the lights are off). The exhausted air from the restrooms shall be limited to no more than 10% of any subsequent supply air stream. Reference: Section 403.2.1 (4), IMC 2012. 3. Condensate drains may not decrease in size in the direction of flow (see detail 3/M2). Reference: Section 307.2.2, IMC 2012. |
| 05/11/2018 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Provide the size and serial number of the utility water meter serving this building. 2. Provide the total water demand delivered by the water meter. 3. Provide the size of the bacflow preventer associated with the utility water meter. |
| 05/24/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/05/2018 | QJONES1 | APPROVAL SHELF | Completed |
| 06/05/2018 | QJONES1 | OUT TO CUSTOMER | Completed |
| 06/05/2018 | QJONES1 | REJECT SHELF | Completed |