Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T18CM03270
Parcel: 114500180

Review Status: Completed

Review Details: WALK THRU - RES

Permit Number - T18CM03270
Review Name: WALK THRU - RES
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/01/2018 KELLY LEE ZONING REVIEW Reqs Change FROM: Kelly Lee
Lead Planner

PROJECT:
T18CM03270
8525 E Woodland Road
New Horse Corral Shade Structure & Stable


TRANSMITTAL: May 1, 2018

COMMENTS: The following comments are for the purpose of applying for a variance before the Board of Adjustment (UDC Section 3.10.1).


This site is located in the SR zone (UDC 4.7.4). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-3). See Use-Specific Standards N/A.

Detached accessory buildings are not permitted in the buildable area extending the full width of the lot between the principal building and the front street lot line, except for terraces and steps not over three feet high above the natural grade, paved areas, and fences or walls (UDC Section 6.6.3.B). A Board of Adjustment Variance will be required for the new horse corral shade structure in the front yard between the principal use the front property line.

All buildings for animals shall be setback at least 50 feet from all property lines, except corrals, which must be setback ten feet from all property lines. A Board of Adjustment Variance will be required for any reduction in the required setbacks.

The total gross floor area (gfa) of all accessory structures shall not exceed 50% of the gfa of the principal structure. Accessory structures less than 200 square feet gfa are exempt from this requirement (UDC Section 6.6.3D). A Board of Adjustment Variance will be required for exceeding the 50% requirement with the proposed structures totaling 14,648 square feet and the principal structure is 1360 square feet.
07/16/2018 QJONES1 ENGINEERING REVIEW Approved
07/16/2018 QJONES1 BUILDING-RESIDENTIAL REVIEW Needs Review