Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM02886
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/24/2018 | STEVE SHIELDS | ZONING | REVIEW | Passed | |
04/24/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
04/24/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
04/24/2018 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
04/24/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet G001; Restroom Calculations: The number of provided men's water closets should be revised to 2. 2. Sheet A111; Keynotes for G6: Notes 7 and 13 reference Sheet AG001. Please revise. 3. Sheet A111; Keynotes for G6: Notes 12 and 13 were not located on the plan. Please verify. 4. Sheet A111; Floor Plan: Two details at the south end of the building reference Sheet AG001. Please revise. 5. General: Please provide written responses to all review comments. |
04/24/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
04/24/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide the developed pipe lengths from the gas meter to each gas load. 2. Verify that the the developed length of hot water pipe from the existing S-1 sinks to their hot water sources is not greater than fifty-feet. |
04/24/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
04/24/2018 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |