Permit Number: T18CM02690
Parcel: 117033040

Address:
735 N 4TH AV

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T18CM02690
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/12/2018 MMORENO1 ZONING REVIEW Approved
04/12/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
04/12/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
#1. Plan Sheet E0.1 not stamped by Registrant.
#2. Provide complete compliance with the Tucson/Pima County Outdoor Lighting Code for the Exterior Lighting. This Code can be printed or downloaded from www.tucsonaz.gov/pdsd.
#3. The permit needs to reflect both addresses for the two electrical services shown on the plans.
2012 IBC sec 107.2.1, Tucson/Pima County Outdoor Lighting Code
04/12/2018 MMORENO1 ENGINEERING REVIEW Passed
04/12/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
04/12/2018 ROBERT SHERRY WATER REVIEW Completed
04/13/2018 JVINCEN1 FIRE REVIEW Approved
04/17/2018 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet G1.01; Sheet A2.01; Floor Plans: The existing restroom is not required to be accessible. The new restroom (water closet and sink are functional) must be accessible, but does no appear to be accessible per the ICC/ANSI Section 604.3.3. Please verify.
2. Sheet A10.01; Partitions: Interior partitions are required to resist lateral loads of 5 psf over the height of the wall. Add diagonal bracing at the top of the partitions, or provide structural calculations indicating partitions meet that criteria without bracing. If bracing is used, indicate the bracing size and spacing, and indicate the size and quantity of connectors at the top of the partition and to the structure above.
04/17/2018 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed