Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T18CM02661
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/20/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
04/20/2018 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | My apologies, I am requesting information about the public water meter owned by Tucson Water and its backflow preventer. [Initial comment: Provide the size of the water meter serving this suite, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2012.] |
04/20/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The proposed Sloan SF-2200 faucet has 2 options for time-out settings, 7-seconds and 70-seconds. For accessibility, the shortest time-out setting must be for at least 10-seconds. At a flow rate of 0.5 GPM, a 70-second time-out will deliver 0.58-gallons per cycle. State how the lavatory faucet will be limited to a deliver of 0.25-gallons per cycle. [Initial comment: Provide an automatic faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucet will operate for a minimum time of 10-seconds. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.] 2. The shut off valve is still shown in the water heater detail. [Initial comment: Explain how the installation of a shut-off valve for the thermal expansion tank complies with the installation instructions. Reference: Section 303.2, IPC 2012.] |
04/20/2018 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
04/20/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
04/20/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed |