| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/01/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 05/07/2018 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
| 05/09/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. The response to the comment requiring structural design and analysis for the water heater stand contained on sheet A3.0 Keynote 9 is referencing the Structural Plans. The required information is missing from the Structural Plans. Please provide. IBC 107.2.1 2. Detail 11 on sheet D-3.0 makes reference to the Structural Plans for the maximum distance for blocking for anchorage of the roof access ladder but this information is not contained in the drawings. Please provide required information. IMC 306.5 |
| 05/11/2018 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T18CM02523 - Catalina Village Assisted Living (R-1 / R-3 Zoning) Building Plan Review (2nd Review) New Administration Building 5324 E. 1st Street TRANSMITTAL DATE: May 11, 2018 DUE DATE: May 24, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans but cannot approve them at this time. The development package related to this development was not available for comparison with the building plans as it relates to the zoning review purview, which includes the building square footage, building height, building footprint, and location on the site. 2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. (Include as reference a copy of the most current or the approved and PDSD stamped version of the DP with the next building submittal.) 3. COMMENT: If any changes are necessary, due to the PDSD Commercial Plan Reviewer's comments that affect or change the building footprint, height, or square footage, the DP will need to be updated prior to approval of the building plans by Zoning. 4. COMMENT: Once the plans have been reviewed and approved by the Commercial Plan Reviewers and zoning has verified consistency with the approved and stamped DP, the building plans can be approved by zoning. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: building plans |
| 05/16/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 05/16/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed. Both the primary drain and the overflow drain have dome covers. See the manufacturer's information for the specified roof drain assembly and detail 2/P2.1. [Initial comment: The depiction of the overflow roof drain in Detail 13/D-2.0 is incorrect. Verify that the roof drains used for the secondary (overflow) roof drainage system conform to ASME A112.6.4 0r ASME A112.3.1. Reference: Section 1102.6, IPC 2012.] 2. Now that the patio roof drains have been replaced with a scupper, provide overflow protection for the roof (i.e. a second scupper of equal capacity but located 2" higher than the low point of the roof. Reference: Sections 1101, 1106 and 1108, IPC 2012. [Initial comment: The size of the horizontal storm drainage piping for the patio roof is not included in Table 1106.3; revise the size of the pipe. Reference: Section 1106.3, IPC 2012.] 3. Provide structural calculations for the mounting shelf for the 590-pound water heater to show that the water heater will be safely supported from the building structure. Reference: Section 301.2, IPC 2012. [Initial comment: Coordinate the specifications of the water heater with the architect; the architect calls for a gas-fired water heater on sheet A-3.0 (keynote 9).] |
| 05/17/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 05/22/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide full compliance with the Tucson/Pima County Outdoor Lighting Code for the exterior lighting. |
| 05/24/2018 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | T18CM02523 1) Engineering has reviewed the building plans but cannot approve them at this time. Once the development plan (DP) has been reviewed and approved, Engineering will review the building plans to ensure conformance with the approved DP 2) Show on plans that any roof drains (downspouts) scupper underneath sidewalks or pedestrian walkways. Reference City of Tucson Technical Standard (TSM) 7-01.4.1.E. Coordinate placement of scuppers with the DP John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |