Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM02485
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/04/2018 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
04/04/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the COMcheck envelope compliance certificate; use the correct code (2012 IECC) and coordinate the insulation with the drawings. 2. Show how supply air to room 108 is to return to the AC unit. 3. Show how secondary condensate drainage is provided for the new fan coils. |
04/04/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
04/04/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
04/04/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1.0; Partition Detail B: Are the new studs connected to the existing CMU wall? Please verify. 2. Sheet A1.0; Partition Detail B: The top of this partition must be braced to the existing roof structure. Please indicate the brace and give the brace size, spacing, and connection to the structure above and the the partition. 3. Sheet A1.0; Partition Detail C: The top of this partition must be braced to the existing roof structure. Please indicate the brace and give the brace size, spacing, and connection to the structure above and the the partition. 4. Sheet A2.0; South Elevation: The City of Tucson requires all lettering (upper and lower case) to be a minimum of 3/32" in height. Please revise the key note indicators. 5. General: Please provide structural calculations for the new foundation and wall designs. 6. General: Please provide written responses to all review comments. |
04/05/2018 | MARTIN BROWN | FIRE | REVIEW | Reqs Change | Code review box indicates NO sprinklers. Another part of cover sheet indicates sprinklers. Please clarify. |
04/11/2018 | LPEREZ2 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
04/11/2018 | LPEREZ2 | ENGINEERING | REVIEW | Needs Review | |
04/11/2018 | LPEREZ2 | ZONING | REVIEW | Needs Review |