Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T18CM02148
Parcel: 12310001C

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T18CM02148
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/10/2018 MARTIN BROWN FIRE REVIEW Approved
04/13/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Verify that the pipe sizes called out for the flush valves will not result in water velocities greater than that recommended by the pipe manufacturer (e.g. limit the water velocity to less than 8 FPS for copper). At a minimum design flow rate of 25 GPM for a siphonic, flush-valve water closet, a 1" Type L copper pipe has a flow velocity of 9.7 FPS. Reference: Table 604.3, IPC 2012.
04/13/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
04/13/2018 ROBERT SHERRY WATER REVIEW Completed
04/18/2018 DAVID RIVERA ZONING REVIEW Approved
04/19/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
04/25/2018 LOREN MAKUS ENGINEERING REVIEW Passed
04/27/2018 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A9.0.1; Partition Types 7C and 7D (2 Hour): The boxed information indicates a one hour rated partition, while the Partition Type indicates a two hour. Please coordinate.
2. Sheet A9.0.1; Partition Type 8: The Partition Types 8A and 8C indicate non-rated, one hour, and two hour rated partitions, while the boxed information does not indicate any rated assemblies. Please clarify.
3. Sheet A9.3.0; Door Schedule: Doors 1102C, 1106B, 1107B, and 1108B are located in smoke partitions. Per Sheet G3.1 (Door Fire Resistive Construction Symbols), these doors require a fire resistance rating that is not indicated in this schedule. Please provide the rating, and reference Sheet G3.1 for more information.
4. Sheet A9.3.0; Door Schedule: Doors 1115, 1118B, and 1118C are not listed in this schedule. Per Sheet G3.1 (Door Fire Resistive Construction Symbols), these doors require a fire resistance rating that is not indicated in this schedule. Please add these doors to the schedule, provide the rating, and reference Sheet G3.1 for more information.
5. Sheet A9.3.0; Door Schedule: Please verify all doors located in this submittal (as indicated on Sheet A2.1.0) are included in the Door Schedule.
6. General: Please provide written responses to all review comments.
04/27/2018 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
05/08/2018 TWEIDEM1 APPROVAL SHELF Completed
05/08/2018 TWEIDEM1 OUT TO CUSTOMER Completed
05/08/2018 TWEIDEM1 REJECT SHELF Completed