Permit Number: T18CM02095
Parcel: 117143570

Address:
728 S 11TH AV

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T18CM02095
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/26/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
#1. Provide a complete panel schedule for panel 'C1'.
#2. The #6 AWG feeders for panel 'B'are undersized for a 100 amp OCPD. 240.4 NEC
Ref: 2012 IBC sec 107.2.1, 2011 NEC
03/26/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Clarify the remark for the sink in the fixture unit schedule; how is the sink related to a water closet?
2. The design of the water heater piping (see detail 7/P501), with a valve located between the water heater and the expansion tank, makes it impossible for the expansion tank to accommodate the thermal expansion of the water in the water heater, as intended by Section 607.3, IPC 2012.
3. Revise the configuration of the natural gas sediment trap, as shown in detail 7/P501, to comply with the requirements of Section 408.4, IFGC 2012 (i.e. the sediment trap is to be located downstream of the appliance shutoff valve, as close to the appliance as possible).
4. Provide a site drawing showing the size, route, and slope of the building sewer and the location of its connection to the public sewer. Reference: Section 107.2.1, IBC 2012.
5. Specify the carriers for the wall-hung water closets and lavatories. Reference: Section
6. Thermostatic mixing valves are not optional for lavatories in public restrooms. Provide tempered water for the lavatories using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012.
7. Provide details showing the construction of the shower floors in accordance with the requirements of 417.5.2, IPC 2012.
8. Verify that the pipe sizes called out for the flush valves will not result in water velocities greater than that recommended by the pipe manufacturer (e.g. limit the water velocity to less than 8 FPS for copper, PEX, or CPVC piping). At a minimum design flow rate of 25 GPM for a siphonic, flush-valve water closet, a 1" Type L copper pipe has a flow velocity of 9.7 FPS. Reference: Table 604.3, IPC 2012.
9. Provide the rim elevation of the next upstream sanitary manhole (manholes?) and the first floor elevation. Determine the need for a backwater valve per Section 715.1, IPC 2012, as amended by the City of Tucson.
10. A plumbing vent may not be used for any purpose other than venting of the plumbing system (See keynote 3, P412). Reference: Section 091.4, IPC 2012.
11. Provide automatic or manual controls for the circulating hot water system per Section C404.6, IECC 2012.
03/26/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Correct the fan schedule description (e.g. Area served, Service) of exhaust fan EF-2. Reference: Section 107.2.1, IBC 2012.
2. Provide the sequence of operation for exhaust fans EF-1 and EF-2. How are the potentiometers to be employed? Reference: Section 403.3, IMC 2012.
03/26/2018 ROBERT SHERRY WATER REVIEW Reqs Change 1. Provide the size and location of the backflow preventer serving this building. Provide the specifications for the backflow preventer that justify the 4 PSI pressure drop noted in the water calculation.
2. Correct the sum of the water fixture units and recalculate the water demand.
03/27/2018 JOHN VAN WINKLE ENGINEERING REVIEW Passed
03/27/2018 DAVID RIVERA ZONING REVIEW Passed
04/02/2018 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A212; Renovation Keynotes: Note 7 was not located on the plan. Please verify.
2. Sheet A401; General Notes: Please finish the detail reference in Note C.
3. Sheet A401; Plumbing Fixtures: The electric water cooler (EWC) was not located on these elevations. Please verify.
4. Sheet A501; New Construction Keynotes: Note 3 was not located on the new door details. Please verify.
5. Sheet A501; Door Detail H: Keynote 1 pointing to the new door is incorrect. Please verify.
6. Sheet A501; Door Detail C: Keynote 2 is indicated in two locations. Both are incorrect. Please revise.
7. Sheet A501; Door Detail D: Keynote 1 is indicated in two locations. Both are incorrect. Please revise.
8. Sheet A501; New Door Detail H: This detail indicates the door opens out to the west, while the plan on Sheet A210 indicates the door opens out to the north. Please coordinate.
9. Sheet A601; Door Schedule: There is no Hardware Set HW-01 indicated in the Door Schedule. Please remove it from the Hardware Schedule.
10. General: Please provide written responses to all review comments.
04/04/2018 MARTIN BROWN FIRE REVIEW Reqs Change Please add fire alarms (monitoring), fire sprinkler underground installation, and fuel storage tanks to the list of deferred submittals. These will all need a separate permit from the fire department.