Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T18CM01806
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/03/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
05/09/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
05/15/2018 | DAVID RIVERA | ZONING | REVIEW | Approved | |
05/18/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. An appeal to the building official has been filed. [Initial comment: The portion of the building shell being modified in this activity does not appear to have been conditioned. Section C101.4.5, IECC 2012 requires the space to be brought into full compliance with the current energy code. Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012.] 2. Heating and cooling load calculations were not included with this submittal. [Initial comment: Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Use the exterior design conditions shown in Section 302.2, IECC 2012, as modified by the City of Tucson. Reference: Sections C302.2, C403.2.1, and C403.2.2, IECC 2012 as amended by the City of Tucson, and Section 312.1, IMC 2012.] |
05/18/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
05/18/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The revised plumbing floor plans show the addition of a new restroom off of the play area but no waste and vent piping is shown for the new restroom. Reference: Section 107.2.1, IBC 2012. |
05/24/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/04/2018 | QJONES1 | APPROVAL SHELF | Completed |
06/04/2018 | QJONES1 | OUT TO CUSTOMER | Completed |
06/04/2018 | QJONES1 | REJECT SHELF | Completed |