Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM01698
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/05/2018 | STEVE SHIELDS | ZONING | REVIEW | Needs Review | |
| 03/05/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide COMcheck analysis for the addition to the building envelope, interior lighting, and for the new mechanical equipment, 2. Provide heating/ cooling calculations for the new HVAC units. 3. Provide ventilation calculations for the addition and for the changes to the church mezzanine. 4.Provide an exhaust fan for the mezzanine restroom. 5. Show how the air for the mezzanine returns to the HVAC unit. 6. Show how the exhaust fans are controlled. |
| 03/05/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. #1.Please show controls, and branch circuit wiring for the three new exhaust fans. Designated circuit and panel. #2. Locate the new AC unit and Insta Hot, disconnecting means, Circuit and panel desinations on the floorplans. #3. Provide full compliance with the Tucson/Pima County Outdoor Lighting Code for the new exterior luminaires. #4. Provide compliance with the 2012 IECC for lighting. #5. Identify all luminaires with a mark on the floor plan that correlates with the luminaire schedule. Ref: 2012 IBC sec 107.2.1, 2011 NEC art. 408. |
| 03/05/2018 | SSHIELD1 | ENGINEERING | REVIEW | Needs Review | |
| 03/05/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Supply the site plans 2. Provide a specification for the mezzanine lavatory. 3. Verify the model number of the proposed water heater. Is the unit listed for outdoor use? 4. Provide cleanouts at the junctions of the building drains and the building sewers. 5. Where are the drinking fountains? |
| 03/05/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 04/25/2018 | LPEREZ2 | BUILDING-COMMERCIAL | REVIEW | Denied | |
| 04/25/2018 | LPEREZ2 | FIRE | REVIEW | Needs Review | |
| 04/25/2018 | LPEREZ2 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |