Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW - COMMERCIAL TI
Permit Number - T18CM01454
Review Name: 3RD PARTY REVIEW - COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/15/2018 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 04/03/2018 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Provide a site plan showing the installation of the water service to the building and the installation of the building sewer. Reference: Sections 104.2 and 107.2.1, IBC 2012. 2. Show the location of the existing (or proposed) water meter, backflow preventer, and the water service pipe on a site plan. Provide the sizes of each. Reference: Section 107.2.5, IBC 2012. 3. Revise the water pressure calculations to reflect the current activity (e.g., 285.5 fixture units does not equal 19 GPM and the site water pressure is in excess of 80 PSI). |
| 04/12/2018 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 04/12/2018 | FRODRIG2 | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Completed | |
| 04/12/2018 | CTREVIL1 | ADA | REVIEW | Passed | 3rd Party review of accessibility inside bldg |
| 04/12/2018 | STANTEC | 3RD PARTY REVIEW-COMMERCIAL | AT 3RD PARTY OFFICE | Approved | |
| 04/13/2018 | SSHIELD1 | ZONING HC | REVIEW | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/01/2018 | BLARSON1 | OUT TO CUSTOMER | Completed |