Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM01385
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/22/2018 | MCASTRO2 | ZONING | REVIEW | Approved | |
| 02/22/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | REVISE THE MECHANICAL DESIGN TO AVOID USING THE EGRESS CORRIDOR AS A DUCT. |
| 02/22/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. #1. Revise the outdoor lighting calcs to reflect the correct calculated total lumen output. |
| 02/22/2018 | MCASTRO2 | ENGINEERING | REVIEW | Passed | |
| 02/22/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A2.0; Floor Plan: In Restroom 112, it does not appear the required maneuvering clearance (18") on the pull side will meet the ICC/ANSI requirement in Figure 404.2.3.2(a). Please clarify. 2. Sheet A2.0; Floor Plan: Please identify the west walls of Restroom 112 using the wall type schedule. 3. Sheet A2.0; Floor Plan: Please indicate the single point of use water dispenser on the plan, and add note that the dispenser meets accessibility requirements. 4. Sheet A5.0; Elevation 8: Please provide details for the location of the grab bars and shower control for the transfer type shower per ICC/ANSI Section 608.4. 5. General: Please provide written responses to all review comments. |
| 02/22/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 02/22/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide a shut off valve for the refrigerator water supply and show it's location |
| 02/22/2018 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 02/22/2018 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |