Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T18CM01145
Parcel: 30503004B

Review Status: Completed

Review Details: REVISION - - 1ST

Permit Number - T18CM01145
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/10/2018 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. General: The revised foundation plan (Drawing 2) does not match the approved original (Sheet S4.0). The approved drawings by the licensed professional in responsible charge (George Stevenson) must be revised to match the deferred submittal, then approved by the City of Tucson before the deferred submittal may be reviewed.
2. General: The revised roof framing plan (Drawing 7) does not match the approved original (Sheet S5.0). The approved drawings by the licensed professional in responsible charge (George Stevenson) must be revised to match the deferred submittal, then approved by the City of Tucson before the deferred submittal may be reviewed.
3. General: The revised foundation sections (Drawing 3) do not match the approved original building section foundations (Sheet S6.0). The approved drawings by the licensed professional in responsible charge (George Stevenson) must be revised to match the deferred submittal, then approved by the City of Tucson before the deferred submittal may be reviewed.
4. General: The revised framing sections (Drawings 8 through 16) do not match the approved original sections and details (Sheet S6.0). The approved drawings by the licensed professional in responsible charge (George Stevenson) must be revised to match the deferred submittal, then approved by the City of Tucson before the deferred submittal may be reviewed.
5. General: The original canopy permit was reviewed and approved based on 660 SFof standard steel construction. This deferred submittal provides calculations and drawings for a 20' x 60' (1200 SF) of a pre-manufactured steel building. Please clarify.
6. General: Please provide written responses to all review comments.
05/11/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
#1. There are no electrical plans or response from the last electrical plan review included in this submittal.

Final Status

Task End Date Reviewer's Name Type of Review Description
05/17/2018 KROBLES1 OUT TO CUSTOMER Completed