Permit Review Detail
Review Status: Completed
Review Details: WALK THRU - COMM
Permit Number - T18CM00910
Review Name: WALK THRU - COMM
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/13/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 02/22/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A-CS; Description: The title located over the site aerial map indicates "Photovoltaic System on Elevated Canopies and Rooftop". Are there any new rooftop panels on this project? Please verify and revise as required. 2. Sheet A-1.0; Code Data: Typically the shade structures are classified as "U" and the parking structures are classified as "S-2". Are any of these new structures for covered parking? Sheet A-1.0 indicates new shade structures #3 and #4. Please add structures #1, #2, and #5 to this note and revise the allowable areas as required. 3. Sheet S1; General Structural Notes (Foundations): Please include in the drilled pier footings the allowable skin friction is 400 psf and the allowable end bearing capacity is 6000 psf. 4. General: Please provide written responses to all review comments. |
| 03/05/2018 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Passed | |
| 03/05/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. The TEP meter number for the 2500 amp service shown on the line diagrams does not correlate with the meter number on the plan sheet designations (plan title blocks). Ref.2012 IBC 107.2.1 |