Permit Review Detail
Review Status: Completed
Review Details: CELL TOWER/ANTENNAS
Permit Number - T18CM00667
Review Name: CELL TOWER/ANTENNAS
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/27/2018 | ROBERT SHERRY | BUILDING-COMMERCIAL | REVIEW | Reqs Change | The structural evaluation of the cell tower modifications dated 9/14/2017 does not correspond to the scope of work shown on the drawings. The drawing indicate the removal of no equipment but the addition of three antennas, three 800 MHz radios, and three 2.5 GHz radios. Coordinate the structural calculations with the drawings. [Second comment: The submitted summary of structural calculations does not correspond to the proposed modification to the equipment mounted on the existing monopole. Not only is the existing and proposed equipment different from that analyzed with the initial submittal, the carrier has been changed from Sprint Nextel to AT&T. Submit a structural analysis of the effect of the currently proposed modifications on the tower foundation and base plate in addition to the antenna mounts.] [Initial comment: Provide a structural analysis of the effect of the modifications on the tower foundation and base plate in addition to the antenna mounts. Reference: Section 107.2.1, IBC 2012.] |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/03/2018 | QJONES1 | APPROVAL SHELF | Completed |
| 05/03/2018 | QJONES1 | OUT TO CUSTOMER | Completed |
| 05/03/2018 | QJONES1 | REJECT SHELF | Completed |