Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM00555
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/23/2018 | MCASTRO2 | ZONING | REVIEW | Approved | |
| 01/23/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide clearance around the condensing unit and the fused disconnect per the manufacturer and the NEC. Reference: Article 110.26, NFPA 70-2011 and Section 304.1, IMC 2012. 2. Provide locking access port caps for the condensing unit. Reference: Section 1101.10, IMC 2012. 3. Provide the calculated heating and cooling loads for the building. 4. Provide the heating capacity along with the sensible and total cooling capacity of the proposed split-system heat pump. 5. The "Additional Efficiency Package Requirements" noted in COMcheck (C406, IECC 2012) is not applicable to tenant improvements or building additions, only to new construction. Reference: Section C401.2.1, IECC 2012. |
| 01/23/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 01/23/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 01/23/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1; Detail 1: Please provide the size of the diagonal brace and the spacing on the detail. 2. Sheet A1; Demolition Plan: The south wall of the Storage Unit #1 is an existing wall to remain. Please indicate Keynote 5 at that wall on the west portion. 3. Sheet 1; Floor Plan: Is the south wall of the restroom 106 new? Please indicate in the Wall Types (Type 5). 4. Sheet A2; Restroom Elevations: Please revise the title to "R.R. 106 Elevations". 5. General: Please provide written responses to all review comments. |
| 01/23/2018 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide the size and location of the required reduced pressure backflow preventor assembly for this building. |
| 01/23/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide the size of the water service pipe for this building and vewrify that it is adequately sized based on the submitted calculations. 2. Show the location of the building sewer. Verify that a backwater valve is not required. 3. Provide an automatic faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucet will operate for at least 10-seconds. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. |
| 01/23/2018 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 02/20/2018 | QJONES1 | ENGINEERING | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/20/2018 | QJONES1 | APPROVAL SHELF | Completed |
| 02/20/2018 | QJONES1 | OUT TO CUSTOMER | Completed |
| 02/20/2018 | QJONES1 | REJECT SHELF | Completed |