Plan Number: T17PI00042
Parcel: Unknown

Address:
3001 N SWAN RD

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T17PI00042
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/01/2018 LPETERS2 DOT PERMITS & CODES REVIEW Denied I have reviewed this pland and have the following comments:

1. Plans do not show a proposed pavement section or the type of asphalt to be used.
2. Sheet 2 - Sidwalk along Swan is pushed back away from the curb. Why did you move this closer to the propoerty line?
3. The slope between ramp, arcoss the new drives ways needs to be ADA compliant. Please make sure that this is shown.

No further comments.

Lance Peterson, P.E.
520-837-6777
02/05/2018 JIM FEMLING DOT STREET MAINTENANCE REVIEW Denied Date: February 5, 2018
Project Name: Shell Building
Plan No. U-2017-023
Activity No. T17PI00042
Project Reviewer: James Femling, Streets & Traffic Maint.

Comments:
TDOT Streets & Traffic Maintenance Division has reviewed the PIA plan and recommends denial/resubmittal. The following comment needs to be addressed prior to submitting the mylar plan set of final approval.

It appears that two existing water meters and one fire hydrant will be located in the new sidewalk, these should be moved out the new sidewalk.

If you have any questions, I can be reached at 791-3154 or James. Femling@tucsonaz.gov.
02/06/2018 LINZUNZA PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
02/06/2018 CSALTZM1 DOT ENGINEERING REVIEW Denied 1. Sht. 1 of 3 - Add plan No. U-2017-023 to all sheets Title Blocks
2. Sht. 1 of 3 - Top Center add PIA No. T17PI00042
3. Sht. 1 of 3 - Location Map - Remove E. Camp Lowell Dr.
4. Sht. 1 of 3 - leader for this Project should be directed to the star and not to the section corner.
5. Sht. 1 of 3 - Bases of Elevation on the North West corner of Fort Lowell Rd. and Swan Rd. Will this work remove the BM located on the existing curb and If so, need to establish temporary BM's for the project site,.
6. Sht. 1 of 3 - Section B Swan Road - Place curb adjacent to curb. Remove note "varies 0'-35' and replace with constant dimension (2 ft.)
7. Sht. 2 of 3 - See City of Tucson Drafting Standards - North Arrows Up or to the left.
8. FYI - Station at Survey monument shown as starting at 0+00. Using 10+00 as a starting station the project will not have negative stations.
9. Sht. 2 of 3 - Need curve table for all curves shown.
10. Sht. 2 of 3 - Sidewalk along Swan Rd. and east side of property, bring out to curb (2 ft. from back of curb).
11. Sht. 2 of 3 - Access Ramp at Ft. Lowell Rd. and Swan Rd. (northwest corner) replace single access ramp with double. Directing pedestrians to center of crosswalk and not to center of intersection.
12. Sht. 2 of 3 - Call out "CL & Construction CL". The first CL which is call out is the center line of What?
13. Sht. 2 of 3 - Both profiles call out note "5' crosswalk @ 2% max." Remove the 2% Max note call out the actual slope across the sidewalk with elevations.
14. Sht. 2 of 3 - Remove striping from plan views.
15. Sht. 2 of 3 - Shade 2 ft. of pavement - called out in note 1 on plans.
16. Sht. 3 of 3 - Need Pavement Structural Section
17. Sht. 3 of 3 - Remove Standard Details from sheet. See Paving Notes No. 3
18. Prior to next submittal schedule meeting with staff.
02/06/2018 LINZUNZA PIA COORDINATOR OUT TO CUSTOMER Completed
12/07/2017 LINZUNZA UTILITY CLEARANCES COT STREETS DIVISION Completed
12/07/2017 LINZUNZA UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
12/07/2017 LINZUNZA UTILITY CLEARANCES PC WASTEWATER MGMT Completed
12/07/2017 LINZUNZA UTILITY CLEARANCES QUEST COMMUNICATION Completed
12/07/2017 LINZUNZA UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
12/07/2017 LINZUNZA UTILITY CLEARANCES COX COMMUNICATION Completed
12/07/2017 LINZUNZA UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
12/07/2017 LINZUNZA UTILITY CLEARANCES EL PASO NATURAL GAS Completed
12/07/2017 LINZUNZA UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
12/14/2017 GARY WITTWER DOT LANDSCAPE REVIEW Denied 1. Please submit your approved NPPO plan.
2. Please identify all plants in the ROW and show how they will be preserved or removed.

3.We request that you provide dust control up to the back of curb.
12/27/2017 ZELIN CANCHOLA DOT TRAFFIC REVIEW Approved