Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - RESUBMITTAL
Plan Number - T17PI00037
Review Name: PIA - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/22/2018 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
02/22/2018 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
02/22/2018 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
02/22/2018 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
02/22/2018 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
02/22/2018 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
02/22/2018 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
02/22/2018 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
02/27/2018 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approved | |
02/28/2018 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approv-Cond | The location I am concerned about is the Mainline crossing at Via Bombackas. Please show that it will be placed in ductile iron pipe and the the owner will become part of Blue Stake. |
03/19/2018 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approv-Cond | March 19, 2018 SUBJECT: La Estancia De Tucson Kolb Road/Camino Boleadoras PROJECT REVIEWER: Richard Leigh, TDOT Engineering Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and recommend a conditional approval. The following comments need to be addressed and plans revised prior to submitting mylar plans set for final approval. Please submit a PDF copy of the revised plan set prior to submitting mylars. 1. Sheet 3: Label all ADOT standards referenced with current ADOT standards. 2. Sheet 3, Detail 6: Verify that referenced details are labeled correctly. 3. Sheet 4: Reference detail for SD1 storm drain connection into RCBC culvert. 4. Sheet 4: Provide rock riprap details (rock size, depth and fabric details) for drainage swales located at Sta.58+39.50, RT & LT, (Camino Boledoras). 5. Provide RCP pipe class for storm drain laterals. If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |
03/21/2018 | TWOLFGA1 | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
03/21/2018 | TWOLFGA1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
07/13/2018 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed |