Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T17PI00030
Parcel: Unknown

Address: Unknown

Review Status: Completed

Review Details: PIA - RESUBMITTAL

Plan Number - T17PI00030
Review Name: PIA - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/04/2017 LINZUNZA UTILITY CLEARANCES COT STREETS DIVISION Completed
08/04/2017 LINZUNZA UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
08/04/2017 LINZUNZA UTILITY CLEARANCES PC WASTEWATER MGMT Completed
08/04/2017 LINZUNZA UTILITY CLEARANCES QUEST COMMUNICATION Completed
08/04/2017 LINZUNZA UTILITY CLEARANCES COX COMMUNICATION Completed
08/04/2017 LINZUNZA UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
08/04/2017 LINZUNZA UTILITY CLEARANCES EL PASO NATURAL GAS Completed
08/04/2017 LINZUNZA UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
08/08/2017 ERNIE ENCINAS DOT_ELEC REVIEW Approv-Cond Pole J - Add "F" head 8' from end of mast arm to provide two through indications on the east side of intersection.

Pole I - Route 16 cc through conduits 14, 16, 19, and 20
08/11/2017 RICHARD LEIGH DOT ENGINEERING REVIEW Approv-Cond August 11, 2017


SUBJECT: Banner University Medical Center Tucson BUMCT Off-Site Expansion & Renovation

PROJECT REVIEWER: Richard Leigh, TDOT Engineering Review

RESUBMITTAL REQUIRED:TDOT Permit Review Section has reviewed the subject PIA paving plan and recommend a conditional approval. The following comments need to be addressed and plans revised prior to submitting mylar plans set for final approval. Please submit a PDF copy of the revised plan set prior to submitting mylars.



1.) Sheet 2 through 15: Revise title blocks so that the titles are all the identical. Extraneous labeling such as sheet details may be placed above the title block.


2.) Sheet 5, Dtl DT/R2: Per City of Tucson Technical Standards Manual Section 10-01.4.2.D requires a minimum 5' x 5' landing be provided at the top of curb access ramps. Please revise detail accordingly.
08/22/2017 ZELIN CANCHOLA DOT TRAFFIC REVIEW Approved
08/29/2017 LPETERS2 DOT PERMITS & CODES REVIEW Approved
08/29/2017 LINZUNZA UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
09/07/2017 LINZUNZA PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
09/07/2017 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved NO RESPONSE FROM JFEMLING - NO COMMENTS - LI 9/7/17
09/07/2017 LINZUNZA PIA COORDINATOR OUT TO CUSTOMER Completed