Plan Number: T17PI00029
Parcel: Unknown

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T17PI00029
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/25/2017 GARY WITTWER DOT LANDSCAPE REVIEW Denied 1. There is existing landscape and irrigation in the location of your new turn bay.
2. Please submit a landscape and irrigation plan to relocate the existing irrigation lines, and provide mitigation for the existing vegetation that will be removed.
3. You will need to provide a new 4" sch 40 PVC sleeve under the eastern driveway and install the relocated irrigation line in it.
4. All irrigation details must be per TDOT standard. New plant materials will be connected to the new TDOT irrigation lines.
5. You will need to hand water the new plant materials to establish them. You must guarantee the plant materials for a minimum of one year.
6. Coordinate all irrigation work with TDOT Streets 791-3154
7. Standard Details are on line at www.tucsonaz.gov/tdot/landscape
06/05/2017 ZELIN CANCHOLA DOT TRAFFIC REVIEW Reqs Change June 5, 2017

SUBJECT: Autozone +Burger King Sorrento Square
PIA Plan T17PI00029, U-2017-006

PROJECT REVIEWER: Zelin Canchola,
TDOT Review Section

DOT Review Section has reviewed the PIA Plan for Traffic Engineering. The following changes/redlines are required for approval:

1. Page 3 of 4 - Add a bicycle lane along the proposed improvements, with appropriate striping.

2. Include striping quantities for new striping.


If you have any questions I can be reached at 837-6659 or zelin.canchola@tucsonaz.gov
06/08/2017 RICHARD LEIGH DOT ENGINEERING REVIEW Reqs Change June 6, 2017


SUBJECT: Offsite Improvement Plans for Autozone + Burger Kink - Sorento Square

PROJECT REVIEWER: Richard Leigh, TDOT Engineering Review

RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to final approval. Please include a response letter addressing the following comments and return any redlined drawings with subsequent submittal.

1. Sheet 1: Include the plan number "U-2017-006" in the title block of each sheet.

2. Sheet 1: Include the PIA activity number "T17PI00029" on cover sheet.

3. Include Golf Links Road in project title.

4. Sheet 1, Paving and Grading note 3, Asphalt Concrete should conform to City of Tucson, TDOT Mix#2. This is a new mix that is different from what is called out in section 406 of the PAG Standard Specifications.

5. Sheet 2: Indicate the placement of a minimum 2' wide pavement section at beginning of pavement taper at Sta. 28+93.16, 39.16 Rt (Golf Links Road).

6. Sheet 2: Provide complete details for the proposed catch basin modification at Sta. 31+40.01, 38+66 RT (Golf Links Road) along with supporting hydrological and hydraulic analysis. Additionally, any proposed grates must be bicycle safe.

7. Sheet 2: The existing curb access ramp located at Sta. ~32+85, 28 Rt must be relocated to be in alignment with the proposed ramp opposite of it per the City of Tucson Unified Development Code, Technical Standards Manual Section 10-01.3.3.E. Additionally, the cross slope of pedestrian crosswalk area must not exceeds 2%.

8. Sheet 2: Clarify driveway composition. It is not clear if the existing asphalt driveway will be removed and replaced with PCC pavement. Indicate removal limits and provide any spot elevations needed to provid positive drainage and ADA compliant pedestrian access.

9. Please Refer to redline drawings for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov.
06/22/2017 LINZUNZA UTILITY CLEARANCES COT STREETS DIVISION Completed
06/22/2017 LINZUNZA UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
06/22/2017 LINZUNZA UTILITY CLEARANCES PC WASTEWATER MGMT Completed
06/22/2017 LINZUNZA UTILITY CLEARANCES QUEST COMMUNICATION Completed
06/22/2017 LINZUNZA UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
06/22/2017 LINZUNZA UTILITY CLEARANCES COX COMMUNICATION Completed
06/22/2017 LINZUNZA UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
06/22/2017 LINZUNZA UTILITY CLEARANCES EL PASO NATURAL GAS Completed
06/22/2017 LINZUNZA UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
06/23/2017 ERNIE ENCINAS DOT_ELEC REVIEW Approved No impact to TDOT electical
06/29/2017 JIM FEMLING DOT STREET MAINTENANCE REVIEW Needs Review NO RESPONSE - FURTHER REVIEW NEEDED. LI 6/29/17
06/29/2017 LINZUNZA PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
06/29/2017 LINZUNZA PIA COORDINATOR OUT TO CUSTOMER Completed