Plan Review Detail
Review Status: Completed
Review Details: PIA - RESUBMITTAL
Plan Number - T17PI00019
Review Name: PIA - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/28/2017 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approved | |
06/28/2017 | LINZUNZA | DOT ENGINEERING | REVIEW | Denied | 1)Per PROWAG Technical Standards- Access Ramp landing,- minimum 25 Sq. Ft. 2)Per PROWAG Technical Standards- Show 2% cross slope for pedestrian path crossing roadway between access ramps. |
06/29/2017 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
06/29/2017 | LINZUNZA | DOT MAPS & RECORDS | REVIEW | Approv-Cond | DATE: 28JUN17 TO: Warren Thompson P.E. Stantec SUBJECT: Resub - Mountain Vail Estates, Part B - Lots 1-22 T17PI00019 / I-2017-005 FROM: Elizabeth Leibold P.E. STATUS: CONDITIONAL APPROVAL The resubmittal of the proposed PIA plans and drainage report for Mountain Vail Estates, Part B were reviewed for compliance with City of Tucson regulations including: Tucson Code Chapters 25, 26, Green Streets Active Practice Guidelines, TDOT Engineering Division Active Practice Guidelines, Technical Manual Sections 4-03 & 4-04, 10-01, and other Tucson regulations. The following comments remain and shall be completed as condition of approval: 1) Tech Man Sec.4-04.10-9.1.21: On section A-A, address the following comments: a) All slope treatment details shall be clarified. Explain thickness of riprap and where grout is not used, call out filter fabric specification. Clarify why concrete grout is used in some details, and other details call out concrete. Thickness of concrete shall be a minimum 2 times the D50 rock size. 2) Tech Man Sec.4-04.10.10: Add the following notes under General Paving Notes (COT PIA): a) All backfill, within the City of Tucson right-of-way, above the utility shading shall be conducted in accordance to the City of Tucson Transportation Standard Details, Specifications, and as directed by the City of Tucson right-of-way inspector and City Engineer. b) All pavement patching, within the City of Tucson right-of-way, shall be conducted in accordance to the City of Tucson Transportation Standard Details, Specifications, and as directed by the City of Tucson right-of-way inspector and City Engineer. c) In accordance to the City of Tucson Standards, permanent pavement patching shall be warrantied for 5-years, pavement patch's failing within this period shall be repaired/replaced at no cost to the City of Tucson. d) If cultural features or remains are found, testing and data recovery shall be completed as needed, Copies of testing plans, testing reports, data recovery plans and final reports shall be submitted to and approved by the City Historic Preservation Office prior to construction work commencing. If, during construction, human remains and associated burial items are discovered, ground disturbing activities in the vicinity of the discovery will cease, the discovery site will be secured, and the Arizona State Museum will be immediately notified as required under A.R.S. 41-865. Call Elizabeth Leibold P.E., CPM, CFM, TDOT Engineering Review Office at 837-4934, if you have questions about these comments. |
06/29/2017 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed |