Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T17PI00013
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/28/2017 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | There appears to be 3 or 4 trees in the ROW that are labeled PIP on the NPPO Plan, but they are not shown on the landscape plans. Please include them. |
03/09/2017 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approved | |
03/14/2017 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
03/14/2017 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
03/14/2017 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
03/14/2017 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
03/14/2017 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
03/14/2017 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
03/14/2017 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
03/14/2017 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
03/14/2017 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
03/15/2017 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | March 13, 2017 SUBJECT: Dock-Hi Industrial Drexel Rd Improvements, I-2017-002 - T17PI00008 PROJECT REVIEWER: Richard Leigh, TDOT Engineering Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to final approval. Please include a response letter addressing the following comments and return any redlined drawings with subsequent submittal. 1. Sheet 1: Include the plan number "I-2017-002" in the title block of each sheet. 2. Sheet 1: Include the PIA activity number "T17PI00013" on cover sheet. 3. Include Development Plan Number on cover Sheet. 4. Sheet 1: Include the projects administrative address on cover sheet. 5. The City of Tucson has adopted the Pima Associates of Government (PAG) 2015 Standard Specification for Public Improvements (SSPI) and Standard Details (SD). Please revise plan set to reflect this change. 6. Sheet 1: Use title block with signature place holders for cover sheet. 7. Sheet 2: Indicate the placement of a curb terminal end treatment at end of curb return at Sta. 23+69.24, 23 RT (Drexel Rd.). 8. Sheet 2 through 4: Verify that all section callouts reference correct page, revises accordingly. 9. Provide a pavement terminal detail for the pavement tapper ends. 10. A public drainage and maintenance easements will be required for the culvers and headwall structures that encroach onto private property per Section 3.4 ofthe City Drainage Manual. Additionally, a flowage easement will be required for the channel and culverts, on private property, that run parallel along Drexel Road City Drainage Manual Sec. 3.4. 11. Provide details for the proposed modified headwalls and wing walls. 12. Please Refer to redline drawings for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |
03/15/2017 | LPETERS2 | DOT PERMITS & CODES | REVIEW | Denied | I have reviewed this plan and have the following comments: 1. Note 5 calls out the 2003 Standard and Details. We have gone to the 2015 PAG standards and Details 2. Providing 4 - 38" x 60" HERCP will span 20 feet and meet the requirements to be included in the National Bridge Inventory. We will need to provide electronic copies of the plans and a structure number application to ADOT. 3. Sheet 8 - Detail B - This detail shows 6-inch thick concrete sidewalk per sTD Detail 200. Typically sidewalk is only 4 inches thick unless it is subject to vehicular traffic. 4. Sheet 8 - A note at the northwest outlet of these pipe has mentioned City forces to re-establish the channel to the north and west. Has this been discussed with our Streets Maintenance Section? Is this a public drainageway? No further comments. Lance Peterson, P.E. (520) 837-6777 |
03/20/2017 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Passed | No comments from JFemling - Approved per LPeterson 03/20/17 - LI |
03/20/2017 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
03/20/2017 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed |