Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T17PI00011
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/28/2017 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
03/06/2017 | BILLIE LEE | COMMENTS | COMMENTS | Passed | No signing and striping per ZCanchola 3/6/17. li |
03/06/2017 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | No comments per JFemling. 3/6/17 |
03/09/2017 | LPETERS2 | DOT PERMITS & CODES | REVIEW | Approved | |
03/10/2017 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
03/10/2017 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
03/21/2017 | ZELIN CANCHOLA | DOT ENGINEERING | REVIEW | Approv-Cond | March 21, 2017 SUBJECT: Uhaul Facility #828073 Public Streets & Roadway Improvements, U-2017-003 - T17PI00011 PROJECT REVIEWER: Richard Leigh, TDOT Engineering Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and recommend a conditional approval. The following comments need to be addressed and plans revised prior to submitting mylar plans set for final approval. Please submit a PDF copy of the revised plan set prior to submitting mylars. 1. Sheet 1: Include the plan number "U-2017-003" in the title block of each sheet. 2. Sheet 1: Include the PIA activity number "T17PI00011" on cover sheet. 3. Include Development Plan Number on cover Sheet. 4. The City of Tucson has adopted the Pima Associates of Government (PAG) 2015 Standard Specification for Public Improvements (SSPI) and Standard Details (SD). Please revise plan set to reflect this change. 5. Provide left and right offsets for all proposed improvements. 6. Sheet 2: Per TSM Section 10-1-3.3, to provide a barrier free pedestrian path along property frontage provide a landing and truncated domes on the existing curb access ramp located on the NWE corner of Benson Highway and Ajo Way and route sidewalk behind the existing traffic signal pole. Additionally, the sidewalk will need to start prior to the end of the end of existing curb along Ajo way per TSM 10-1-3.3.C.5. 7. Please Refer to redline drawings for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |