Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T17PI00009
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/18/2017 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
01/18/2017 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
01/18/2017 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
01/18/2017 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
01/18/2017 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
01/18/2017 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
01/18/2017 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
01/18/2017 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
01/18/2017 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
01/20/2017 | LPETERS2 | DOT PERMITS & CODES | REVIEW | Denied | I have reviewed this plan and have the following comments: 1. Sheet 1 - The plan references PC/COT SSPI. Is this the standards that this is to be constructed under or the new PAG volume 1 standard specification? 2. Sheet 1 - Typically a note include to contact Street Supervisor Paul Rosenboom prior to disturbing any city owned landscaping or irrigation. 3. Sheets 2 - 3 - Plans show several curb access ramps but does not specify type. Elevations are provided but not outs. 4. Sheet 2 - Plan refernecs to see sheet 4 for continuation of the plan. Sheet 4 only contains details. 5. Sheet 4 - Detail 1 Pavers - This detail does not meet our standard with respect to installing pavers. Is there a reason why the standards specification for pavers isnt used? No further commetns. Lance Peterson, P.E. (520) 837-6777 |
02/09/2017 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approved | |
02/15/2017 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | 1. Please clearly identify the ROW on all plans and details. 2. Please submit the landscape plans if there is any new planting in ROW. Per the Downtow Streetscape Policy the main pedestrian walk area is to be concrete. Let me know if you do not have a copy of this policy |
02/16/2017 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | NO COMMENTS - APPROVED BY JFEMLING 2/16/17. |
02/22/2017 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
02/22/2017 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | February 21, 2017 SUBJECT: Mission District of Menlo Park Public Improvement plans, Monier Building U-2017-002 - T17PI00009 PROJECT REVIEWER: Richard Leigh, TDOT Engineering Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to final approval. Please include a response letter addressing the following comments and return any redlined drawings with subsequent submittal. 1. Sheet 1: Include the plan number "U-2017-002" in the title block of each sheet. 2. Sheet 1: Include the PIA activity number "T17PI00009" on cover sheet. 3. The City of Tucson has adopted the Pima Associates of Government (PAG) 2015 Standard Specification for Public Improvements (SSPI) and Standard Details (SD). Please revise plan set to reflect this change. 1. Plans must contain all the information necessary to build project as a "stand alone" project and not rely on references to other plans. Please provide all details of the proposed improvements in the public rights-of-way. 4. Provide stationing, offsets and elevations for all beginning and ending curb returns and angle points and all other proposed improvements. 5. Clearly delineate and label public right-of-way limits and any existing easements within the rights-of-way. 6. Provide a minimum 5' wide unobstructed sidewalk the projects frontage. 7. Please Refer to redline drawings for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |
02/22/2017 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed |