Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T17CM09426
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/16/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Comment not addressed. A field-applied grease duct enclosure must continuously enclose all sides of the grease duct from the duct origin to the duct termination. [Second comment: The detail has been renamed Detail HSD-4 on sheet M5.1 but the same comment still applies.] [Initial comment: Revise the exhaust duct fire wrap note in detail 2/M0.0 to indicate that a field-applied grease duct enclosure must continuously enclose all sides of the grease duct from the duct origin to the duct termination. Reference: Section 506.3.11.2, IMC 2012.] |
03/16/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Refer to the combination waste and vent system along column line 10 and keynote #2 on sheet P1.1: the proposed vent has to traverse 5-feet under the slab before it can rise above the floor level at the column. Show how this will be accomplished. [Initial comment: Revise the plumbing design so that all vents rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally. Note: see the definition of horizontal pipe. Reference: Sections 202 and 905.4, IPC 2012.] |
03/20/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved |